My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09834
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09834
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:05 PM
Creation date
10/12/2006 3:58:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.200
Description
Narrows Unit - Mailing Lists and Correspondence
State
CO
Basin
South Platte
Water Division
1
Date
11/1/1981
Author
unknown
Title
Draft Evaluation of Narrows Unit Colorado Pick-Sloan Missouri Basin Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3QiJ <br /> <br />WOOill~1r <br /> <br />are presented for Narrows development with all authorized purposes and <br />for development without flood control. Commercial power is not included <br />in the allocations since it is not an authorized purpose and is not <br />economically feasible. <br /> <br />Repayment <br /> <br />The water supply for repayment purposes includes the water to be <br /> <br />acquired from the Wel don Valley Canal which woul d be inundated by the <br /> <br />I) <br />. <br /> <br />reservoi r. <br /> <br />Therefore, there woul d be a total water supply of <br /> <br />133,000 acre-feet available for repayment purposes 002,000 acre-feet <br /> <br />provided by the project and the 31,000 acre-feet acquired from Weldon <br /> <br />Valley Canal}. <br /> <br />Irrigation <br /> <br />Irrigation repayment will be based on a water supply of 108,000 acre- <br /> <br />feet annually. <br /> <br />The lower South Platte and the Central Colorado Water Conservancy <br /> <br />Oi stri cts have both entered into repayment contracts with the United <br />States to repay an appropriate share of the allocated irrigation costs. <br />Any modification in the amount to be repaid will necessitate negotiation <br />of the contracts. <br /> <br />Irrigation payment capacity has been indexed to reflect January 1981 <br />prlce levels. The full payment capacity would pay allocated annual OM&R <br />costs for Narrows Dam and Reservoir and repay a part of the allocated <br />irrigation construction obl igations. Table 5 shows that an estimated <br />$8.40/acre-foot is available for construction cost repayment. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.