My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09826
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:56:03 PM
Creation date
10/12/2006 3:58:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
11/1/1981
Title
Evaluation Missouri Basin Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />fIDOOffi~1f. <br /> <br />are presented for Narrows development wi th all authori zed purposes and <br /> <br />for development without flood control. Commercial power is not included <br /> <br />in the allocations since it is not an authorized purpose and is not <br /> <br />economically feasible. <br /> <br />Repayment <br /> <br />The water supply for repayment purposes includes the water to be <br />acquired from the Weldon Valley Canal which would be inundated by the <br />reservoi r. Therefore, there woul d. be a total water supply of <br />133,000 acre-feet available for repayment purposes (102,000 acre-feet <br />provi ded by the project and the 31,000 acre-feet acqui red from Wel don <br />Va 11 ey Canal). <br /> <br />Irrigation <br /> <br />Irrigation repayment will be based on a water supply of 108,000 acre- <br />feet annually. <br /> <br />The Lower South Platte and the Cent~al Colorado Water Conservancy <br />Di stricts have both entered into repayment contracts with the United <br />States to repay an appropriate share ofithe allocated irrigation costs. <br />Any modification in the amount to be repaid will necessitate negotiation <br />of the contracts. <br /> <br />Irrigation payment capacity has been indexed to reflect January 1981 <br /> <br />pr-ice levels. The full payment capacity, would pay allocated annual OM&R <br /> <br />costs for Narrows Dam and Reservoir and repay a part of the all ocated <br /> <br />irrigation construction obl igations. Table 5 shows that an estimated <br /> <br />$8.40/acre-foot is available for constru~tion cost repayment. <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.