My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09812
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:58 PM
Creation date
10/12/2006 3:56:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
South Platte
Water Division
1
Date
9/1/1982
Author
Corps of Engineers
Title
Six State High Plains-Ogallala Aquifer Regional Resources Study - Appendixes Part I - A - B - and C
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- - .... ... u Z <br /> <br />diverted from the North Platte River downstream from Guernsey Dam in <br /> <br /> <br />eastern Wyoming and could be transported to lands either to the north <br /> <br />or south of the river. In anticipation that the Box Butte area would <br /> <br /> <br />be established as an area of need, a plan was developed using one <br /> <br />pumping plant to lift water from the North Platte River Valley to the <br /> <br /> <br />Box Butte area. Recent test drillings, however, indicate more water <br /> <br /> <br />exists in the aquifer than previously thought, so the Box Butte area <br /> <br /> <br />was not considered further as an area of need. <br /> <br />West Tableland Route <br /> <br /> <br />The tableland area lying between the North and South Platte Rivers <br /> <br /> <br />has land suitable for irrigation but there is no available surface or <br /> <br /> <br />ground water supply. The possibility was considered for delivering <br /> <br />North Platte River water to the tableland area in eKchange for water <br /> <br /> <br />delivered to Lake McConaughy from the main canal. Only a few pumping <br /> <br />plants would be required and water could be conveyed by canal southeast <br /> <br /> <br />to the tableland. From the tableland area, the canal could continue <br /> <br /> <br />southward into northeast Colorado to the previously proposed Narrows <br /> <br /> <br />damsite. The water could then be distributed to Colorado service areas <br /> <br /> <br />from the damsite. Later, the decision was made to serve only existing <br /> <br /> <br />irrigated areas and to not create new areas. At this time, service to <br /> <br />the Nebraska tableland area was dropped from consideration. The lack <br /> <br /> <br />of large amounts of water available from the North Platte River and <br /> <br />the potential serious effects on the trout fishery and fall waterfowl <br /> <br />habitat between the diversion and Lake McConaughy also weighted heavily <br /> <br />against this alternative. <br /> <br />East Tableland Route <br /> <br /> <br />The Nebraska tableland area could be served by a branch canal from <br /> <br /> <br />the main canal in northeast Colorado near Julesburg. Using a series of <br /> <br /> <br />pumping plants, water could be conveyed westward to near Sterling, <br /> <br /> <br />Colorado, and then across the South Platte River using a diversion dam. <br /> <br />The water could then be pumped northward across the tableland area <br /> <br />A34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.