Laserfiche WebLink
<br />O";l <br />r- <br />N <br />N <br />c: <br /> <br />xii <br /> <br />THE BOULDER CANYON PROJECT <br /> <br />.. <br /> <br />Compacts . <br />Rights to Water and Electric Power. .., <br />Investigations <br />Conditions <br /> <br />Arguments of the Opposition . <br />State versus Federal Control. <br />Government in the Power Business . <br />The Mexican Situation . <br />Constitutionality of the Boulder Canyon Project <br />Act <br />Legal Aspects <br />Litigation . <br /> <br />CHAPTEI\ IV. CONTRACTS AND FINANCE. <br /> <br />Cost Estimates. <br />Contracts for Power . <br />Determination of Rates. <br />Drafting of the Power Contracts . <br />Legal Aspects and Controversial Points. <br /> <br />Contracts for Water . <br />Determinattan of Rates. <br />Drafting of the Water Contracts . <br />Legal Aspects and Controversial Points . <br />Summary of the Project Revenues. <br /> <br />CHAPTER V. CONSTRUCTION PROBLEMS. <br /> <br />Construction at Black Canyon . <br />Hoover (Boulder) Dam <br />Selection of the Site. <br />Criticism of the Construction Plan . <br />Preliminary Construction . <br />Specifications <br />Contr~~ts . <br />Building of the Dam <br />The Power Plant. <br />Boulder City . <br />Comparison with Other Projects. <br /> <br />PAGE <br /> <br />98 <br />101 <br />102 <br />103 <br />105 <br />106 <br />113 <br />116 <br /> <br />123 <br />123 <br />131 <br />137 <br />138 <br />140 <br />140 <br />146 <br />154 <br />167 <br />167 <br />169 <br />173 <br />182 <br />185 <br />186 <br />186 <br />186 <br />190 <br />194 <br />198 <br />204 <br />206 <br />214 <br />219 <br />226 <br />