My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09806
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:56 PM
Creation date
10/12/2006 3:56:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
11/1/1985
Author
BOR
Title
1985 Evaluation of Salinity Control Programs in the Colorado River Basin
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-,< <br /> <br />w <br />c.;1 <br />o <br />... <br /> <br />SUMMARY OF OTHER ACTIVITIES IN 1985 <br /> <br />Title I <br /> <br />To satisfy the requirements of Minute 242 of the <br />Inter~ational Boundary and Water Commission, Title I of <br />Publit Law 93-320 authorizes the construction of several <br />permaQent measures downstream from Imperial Dam and makes <br />the replacement of bypass and reject waters a Federal obli~ <br />gation. <br /> <br />~. construction of the Bypass Drain in the United <br />States and Mexico, (completed in 1977) <br /> <br />3. implementation of measures for Wellton-Mohawk irri- <br />gation efficiency improvement (Irrigation Management <br />Services, Onfarm Systems Improvement, Research and <br />pemonstrations, Education Program, Technical Field <br />Committee), (measures being implemented) <br /> <br /> <br />The seven measures to be implemented under Title I are: <br /> <br />i. construction of the Yuma Desalting Plant, (under <br />qonstruction) <br /> <br />\~, <br /> <br /> <br />, <br />.' <br /> <br />4. Wellton-Mohawk acreage reduction, (completed in <br />1979) <br /> <br />,"! <br /> <br />S. Painted Rock Reservoir land acquisition and <br />Qperation schedule modification, (acquisition pending <br />~ederal court action to determine whether the Corps of <br />Sngineers has legal authority) <br /> <br />6. construction of the MODE (main outlet drain <br />$xtension) Siphon, (construction completed in 1976) <br /> <br />7. fish and wildlife mitigation measures, (mitigation <br />~easures are ongoing). <br /> <br />In ad~ition, Title I authorizes replacement of the first 49 <br />miles ,of the existing earthlined Coachella Canal with a <br />concr~te-lined canal to reduce seepage and to salvage about <br />l32,OaO acre-feet of water annually. Construction was <br />essentiialy complete for the canal but peripheral contracts. <br />are i~ effect related to the purchase and installation of <br />control equipment for the canal. Title I also authorizes <br />the P~otective and Regulatory Pumping unit which consists of <br />well f:ields and a lateral collection system to enable the <br />United States to pump up to 160,000 acre-feet annually <br />within 5 miles of the Southerly International Boundary. <br /> <br /> <br />,:1 <br />~\' <br /> <br />I <br />! <br /> <br />31 <br /> <br /> <br />-- <br /> <br />1 <br /> <br />..l ,,_,~~ ,"",,' '><0 ..ih hj.;.,,;j,i,,_Mo"',- <br />
The URL can be used to link to this page
Your browser does not support the video tag.