Laserfiche WebLink
<br />W <br />C,JI <br />o <br />o <br /> <br />salin~ water. FY 1986 activities will include drilling test <br />wells 'to provide water samples, ground water elevations, and <br />hydro]ogy data. The study is scheduled for completion in FY <br />1989. t Study activities are being coordinated with USDA's <br />upstr~am activities in the virgin Valley Unit. <br /> <br />. <br /> <br />Palo ~erde Irrigation District unit CA (BR/USDA) <br /> <br />In FY:1985, SCS and Reclamation formulated a joint plan of <br />study. SCS will provide Reclamation with onfarm, onsite <br />evalu~tions and analyses relative to irrigation efficien- <br />cies, ~eep percolation, and prospects for improved onfarm <br />manage,ment. The USDA portion of the evaluation, however, <br />has nd,t yet been funded pending the outcome of Reclamation's <br />Phase !I work. Reclamation completed the shallow well <br />drillV;ng for the verification program in May 1985 and is <br />sampli1ng the test wells. <br /> <br />FY 19~6 Reclamation activities will complete Phase I work in <br />developing hydrosalinity analysis for the Palo Verde <br />Irriga~ion District Unit to determine the movements of <br />ground! water and source of salt loadings. The study will <br />provid~ information for Reclamation, USDA, and the Palo <br />Verde ttrrigation District to determine salinity control <br />program components and the need for further studies. <br /> <br />Glenwdbd-Dotsero Sprinqs Unit CO (BR) <br /> <br />The Regional Director's Proposed Planning Report/Advance <br />Draft ~nvironmental Statement was completed in FY 1985 and <br />was reQeased to the Forum and to appropriate Federal agen- <br />cies fbr field level review. A decision was made, following <br />consultation with the Forum, to defer further investiga- <br />tion. A draft Planning Report Concluding the Study was <br />sent tp Washington on September 30, 1985. <br /> <br />The plan (evaporation pond disposal) is not being pursued <br />since ~t is not as cost-effective as other plans being imple- <br />mented' in the basin and, under Colorado water law, evaporation <br />is not considered a beneficial use of water. <br /> <br /> <br />Saline, Water Use and Disposal Opportunities (BR) <br /> <br />Saline, Water Coolinq System Verification Proqram - The <br />contrapt study of saline water use in Jim Bridger Power <br />Plant round that by using side-stream softeners and disposal <br />ponds,' about 8,000 acre-feet per year of Big Sandy River <br />water could be used with total in-plant costs of about $70 <br />per toh of salt removed. When the costs of well collection <br />features and pipeline costs are included, the total cost- <br /> <br />" <br />-'r <br />J' <br />d <br />, <br />;,J <br />1 <br />'i;' <br />'1 <br />,} <br />! <br />!i <br />'1 <br />, <br />.:A <br />;, <br />I <br />, <br />;~ <br />~1 <br />, <br />~ <br />.:rJ <br /><~ <br />.j: <br /> <br /> <br />27 <br /> <br />- <br /> <br />,. .:" ."'-~ <br /> <br />~ ,~-_.""i~,,-:L .,.,;..;_, <br />