My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09806
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:56 PM
Creation date
10/12/2006 3:56:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
11/1/1985
Author
BOR
Title
1985 Evaluation of Salinity Control Programs in the Colorado River Basin
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />to) <br />. <br />00 <br />~ <br /> <br />l. The Upper Colorado River Basin Fund's portion <br />would be repaid with interest within 50 years or <br />less if the life of the facilities is of shorter <br />.duration, <br /> <br />2. The Lower Colorado River Basin Development <br />Fund's portion would be repaid either without <br />interest during the year following the year the <br />costs are incurred, or, if the fund is unable to <br />repay during that year, with interest as soon as <br />monies are available, <br /> <br />Provides interest rate provisions reflecting realistic <br />costs of borrowed monies to the Federal Government, <br /> <br />Provides that operation and maintenance costs allocated <br />to the two basin funds be repaid without interest the <br />year after they are incurred and that any operation and <br />maintenance costs due to irrigators, State wildlife <br />agencies under contracts with the Secretary of the <br />Interior, be repaid without interest the year after they <br />are incurred, <br /> <br />Deletes the provision for Congressional Committee <br />disapproval of expenditure of funds, <br /> <br />Provides that the Department of the Interior funds <br />appropriated for construction, operation, maintenance, <br />and replacement may be used for any or all of the <br />authorized units. <br /> <br />A loose-leaf notebook was compiled by the Colorado River <br />Water Quality Office bringing together legislative infor- <br />mation and history of the Colorado River Basin Salinity <br />Control Act. The book was distributed to Colorado River <br />Basin Salinity Control Forum and Advisory Council members <br />and to Federal agencies cooperating on program activities. <br /> <br />Evaluation Process <br /> <br />Figure 4 explains the agreed upon evaluation process used <br />for this 1985 report. Overall, the process is essentially <br />broken into four components: basic data, input con- <br />siderations, evaluation and analysis, and review process. <br /> <br />The basic data component reflects DOl and USDA coordinated <br />input of basic data on individual projects used in the <br />evaluation process. Other input considerations were utilized <br />to supplement the facts, figures, and values provided in the <br /> <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.