My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09805
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:55 PM
Creation date
10/12/2006 3:56:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.765
Description
White River General
State
CO
Basin
Yampa/White
Water Division
6
Date
4/1/1997
Author
USFS
Title
Aspen Highlands Ski Area - Record of Decision
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Aspen Highlands Ski Area <br /> <br /> Table 1. Authorized developments for this decision. <br />Development Decision Special Conditions <br />Lifts and Associated Terrain <br />Thunderbowl Lift Yes Remove existing Thunderbowl and Golden Horn lifts. Institute <br /> visual quality guidelines. Minimize tree removal. <br />Steeplechase Lift Yes Timber removal of lift line may require helicopter operations. <br />Highland Bowl No Lift Snow safety studies of the bowl allowed to continue. Aspen <br />Lift Skiing Company to meet annually with the Forest Service. Annual <br /> plan submitted to the Forest Service. <br />Maroon Bowl Lift No Terrain removed from permit boundary. <br />Highland Surface No <br />Lift <br />Ridge Surface Lift No Lift The route on the divide between Maroon and Highland bowls will <br /> require some hand construction in order for the ski patrol to by- <br /> pass a rock face and safely complete avalanche control work. The <br /> skyline will not be altered. <br />Catwalks and Access Roads <br />Steeplechase Yes Install retaining walls where necessary. Geo-technical engineering <br />Catwalk on cut slopes greater than 8 feet. Minimize ground disturbance on <br /> steep slopes. Construction plans reviewed and approved prior to <br /> ground disturbance. <br />Highland Bowl Partial Same as Steeplechase Catwalk. <br />Catwalk <br />Loge Bowl Yes Same as Steeplechase Catwalk. <br />Catwalk <br />Temerity Catwalk Yes Constructed to same standards (48 inch width, hand constructed) <br /> as existing catwalk which provides egress from the Temerity area. <br />Lower Temerity No <br />Maintenance Road <br />Restaurants <br />Merry-Go- Round Yes Use same location and same approximate footprint. Building <br />Restaurant constructed of native materials and to Forest Service standards. <br />Loge Peak No See Patrol Headquarters and/or Interpretive facility. <br />Restaurant <br /> <br />6 <br /> <br />Decision and Rationale <br />Authorized Master Development Plan Components <br />
The URL can be used to link to this page
Your browser does not support the video tag.