<br />003424
<br />
<br /> Table 5
<br /> SUSPENDED SEDIMENT LOAD PASSING IMPERIAL DAM
<br /> IN TONS PER MONTH
<br /> ~ALENDAR YEAR 1981
<br /> All-American Total
<br /> Canal Desilting All-American Gila Gravity Gila Settling Sediment Load
<br /> Basins Return Cana 1 Main Canal Basin Return Passing"
<br />Month To River Station 60 Station 144+50 To River Imperi a 1 Dam*$~~5l
<br />January 69,356 29,939 868 0 100,163
<br />, February 346 5,711 985 0 7,042
<br />March 18,840 19,756 1,352 0 39,948
<br />April 96,893 29,535 2,581 0 129,014
<br />May 27,571 16,087 2,362 0 46,020
<br />June 6,444 14,272 9,025 0 29,741
<br />July 101,263 24,768 7,376 0 133,407
<br />Augus t 156,902 20,567 2,761 0 180,230 #i:~~
<br />'V~'.I
<br /> > ,~$>'
<br />September 13,372 13,008 2,115 0 28,495
<br />October 88 9,080 1,129 0 10,297
<br />November 2,750 1,363 1,237 1,265 6,615
<br />December 90 2,101 379 0 2,570
<br />TOTAL 493,920 186,187 32,170 1,265 713,542
<br />
<br />*Does not include Sediment Load in California Sluiceway
<br />
|