Laserfiche WebLink
<br />,~ <br />if~tfJ <br /> <br />t... <br />-t <br />~ <br />C""; <br /> <br />C' <br /> <br />,~ <br />'~jr' <br /> <br />Table 3 <br /> <br />SEDIMENT SAMPLING STATIONS <br />IMPERIAL DAM AND ALL-AMERICAN CANAL SYSTEM <br /> <br />Locations <br /> <br />IMPERIAL DAM <br />Gila Gravity Main Canal Station 144+50 <br />California Sluiceway <br />Desilting Works - Sludge pipes <br /> <br />ALL-AMERICAN CANAL <br />Station 60 <br />Pilot Knob Hydro Powerplant Forebay <br />Station 1973 <br />East Highline at A.A.C. Station 2972 <br />Central Main A.A.C. Station 3544 <br />Weat Side Main at A.A.C. Station 4 <br />Yuma Main Canal below Siphon Drop <br /> <br />COACHELLA CANAL <br />Station 10 <br />Station 2619 <br /> <br />COLORADO RIVER <br />Yuma Gage <br /> <br />l/ When the plant is in operation. <br /> <br />Responsible Sampling <br />Agency Frequency <br />USBR Twice monthly <br />USBR Twice monthly <br />lID Monthly <br />lID Monthly <br />lID Monthly Y <br />lID Twice monthly <br />lID Twice montlhy <br />lID Twice monthly <br />lID Twice monthly <br />USBR Twice monthly <br />lID Twice monthly <br />lID Twice monthly <br />USBR Twice monthly <br />