My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09790
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:51 PM
Creation date
10/12/2006 3:55:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.70
Description
CRSP
Basin
Colorado Mainstem
Date
3/12/1980
Author
CWCB/WPRS
Title
Annual Planning, Construction and Operating Projects Review, West Slope Projects, Colorado
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LOCATION <br /> <br />West Divide Project <br /> <br />The West Divide Project is located in west-central <br />Colorado in the Upper Colorado River Basin. <br /> <br />. <br /> <br />PURPOSE <br /> <br />The West Divide Project would provide water for <br />irrigation and municipal uses. It would also pro- <br />vide fish and wildlife and recreational benefits. <br /> <br />STATUS <br /> <br />The West Divide Project was authorized for con- <br />struction by the Colorado River Basin Act of <br />September 30, 1968 (Public Law 90-537) as a partic- <br />ipating project under the Colorado River Storage <br />Project Act of April 11, 1956 (Public Law 84-485). <br />The project is now in the advanced planning stage. <br />Detailed geologic, hydrologic, economic, and <br />engineering data have been gathered, and feasibil- <br />ity designs and estimates have been completed by <br />the Engineering and Research Center in Denver. <br />Environmental and cultural resource data collection <br />is nearing completion. <br /> <br />The Draft Definite Plan Report is scheduled for <br />mid calendar year 1980. 'rue Draft Environmental <br />Impact Statement and public hearing are due in <br />mid calendar year 1980 and the Final Environmental <br />Impact St,atement in early calendar year 1981. <br /> <br />MARCIl 1980 STATISTICS <br /> <br />~ (annual average) (acre-feet) <br /> <br />. <br /> <br />Increased supply from project <br />Irrigation water <br />Municipal and indu$trial <br />To tal . <br />Depletion of Colorado River <br /> <br />NEW <br />';A& rLE' <br /> <br />59,400 <br />3,500 <br />62,900 <br />37,200 <br /> <br />IRRIGATION SERVICE AREA (acres) <br /> <br />Full service land <br />Supplemental service land <br />To tal <br /> <br />10,450 <br />14.720 <br />25,170 <br /> <br />PROJECT FEATURES <br /> <br />Reservoirs (acre-feet) <br />Dry Hollow <br />Kendig <br />Canals (ds) <br />West Divide <br />Hunter Mesa <br />Cache Creek <br />Dry Hollow Feeder <br />Pumping plants (cfs) <br />Divide Creek <br />Dry Hollow <br />Uni~ 1 <br />Unit 2 <br />West Divide <br /> <br />23,000 <br />18,060 <br /> <br />95 <br />115 <br />225 <br />130 <br /> <br />130 <br /> <br />105 <br />115 <br />10 <br /> <br />Estimated cost <br />(January 1980) <br /> <br />$200,000;000 <br /> <br />. <br /> <br />tl."C <br />: 1\': <br />'" <br />'" <br />,. <br /><> <br />'" <br /> <br />March 1980 <br /> <br />The FY80 appropriations include $460,000 for fur- <br />ther advanced planning:. <br /> <br />~ <br /> <br />Water for the project would be obtained mainly by <br />pumping from the Colorado River near the town of <br />Silt. This water plus water from East and West <br />Divide Creeks would be distributed throughout the <br />service area by a system of four project canals <br />and the necessary lateral systems. 'A system of <br />pumps would lift the water from the river to the <br />canals and also to Dry Hollow Reservoir for stor- <br />age and later release for irrigation and municipal <br />use. The flows of West Divide Creek, regulated by <br />the construction of Kendig Dam and Reservoir, would <br />be for irrigation and municipal use in the rural area <br />south of Silt. The West Divide Canal and existing <br />ditches would distribute the irrigation releases from <br />Kendig Reservoir. Drains would be provided as <br />needed. Additional municipal water would be made <br />available from Beaver and Battlement Creeks by ex- <br />changing present irrigation supplies in those streams <br />with water from Cache Creek Canal. Diversion and <br />distribution of Beaver and Battlement Creek water <br />made available by exchange from Cache Creek Canal <br />would be the responsibility of the water users. <br />Recreational developments would be provided at both <br />project reservoirs. Late-season diversions from <br />the Colorado River would be replaced by releases from <br />Green Mountain Reservoir (an existing feature of the <br />Colorado-Big Thompson Project). <br /> <br /> <br />RIFLE <br /> <br />GRAND VALLEY <br /> <br />30 <br /> <br />GARFIELD CO. <br /> <br />Beaver <br /> <br />Cr, <br /> <br />FEEDER <br />"'::hANAL <br />;;. I <br />';, DRY HOLLO:1 rr.7:'J /(El/Dle; <br />; '\\. IRES. ~.Er,(4 <br />, ' ,.,,';]~~~, <br />". ,r/\ ! "/. . .) <br />SILT ":""".r"..'".~~0"., J\'~"iJ; "'~ '.__ <br />('..,N;,"!::ii.l '-;{~~i:r--'/ I::. ,<. I D / If I D.T <br />;';t,;iii;;~.ith'?\NIJN rt; I~::;A <br />~,0.i r <br />CANA L <br />I <br />I <br /> <br />.. <br /> <br />MESA CO. <br /> <br />cr, <br /> <br /> <br />ru:: s. <br /> <br />~f' <br /> <br />Project Londs <br /> <br />o pumplno Pint <br /> <br />~ -o--of---= <br />
The URL can be used to link to this page
Your browser does not support the video tag.