Laserfiche WebLink
<br />ANIMAS-LA PLATA PROJECT <br /> <br />. <br /> <br />March 12, 1980 <br /> <br />Schedule <br /> <br />Changes Since March 1979 <br /> <br />Draft Definite Plan Report <br />Draft Environmental Statement <br />Public Hearing <br />Final Environmental Statement <br />Final Definite Plan Report <br /> <br />March 1979 <br />Late Winter 1979 <br />.Summer 1979 <br />Summer 1979 <br />Early Fall 1979 <br /> <br />Current <br />completed 9/14/79 <br />completed 7/25/79 <br />completed 9/4 & 5/79 <br />early calendar year 1980 <br />mid-calendar year 1980 <br /> <br />The following changes have been made in project statistics: <br /> <br />March 1979 <br /> <br />Irrigation Supply (acre-feet) <br />Colorado <br />Full service <br />Supplemental <br />Total <br /> <br />83,460 <br />17,800 <br />lOl,260 <br /> <br />. <br /> <br />Project Costs <br />Construction <br />OM&R <br /> <br />$336,000,000 <br />2,100,000 <br /> <br />Pumping Plant <br />Installed Capacity <br />(kilowatts) <br /> <br />27,000 <br /> <br />Approximate Power Requirements <br />Demand requirement (kWm) <br />Energy (kWh/yr) <br /> <br />375,000 <br />170,000,000 <br /> <br />fv[o(T <br /> <br />Current <br /> <br />83,500 <br />17,800 <br />101,300 <br /> <br />go ,coo <br /> <br />ifF <br /> <br />$392,860,000 <br />2,700,000 <br /> <br />25,500 <br /> <br />357,lOO <br />l65,000,000 <br /> <br />The estimated depletion of the Colorado River in the Feasibility Report Plan <br />was 146,400 acre-feet, and it is projected to be l54,800 in the current plan. <br /> <br />. <br /> <br />23 <br />