<br /> INDIAN CLAl. ,UMMARY UPDATE JANUA1.:' 989
<br /> TOTAL
<br /> POTENTIAL PRESENTLY NEGOTI,\-TED INDIAN SETTLE-
<br /> IND IAN IRRIGATED IRRIGATED IRRIGABLE AMOUNTS U.S.B.R. MENT
<br />STREAM CLAIMS INDIAN NON-IND. IND. LAND A.F./YR PRIORITY PROJ. LAND LANDS NOTES
<br />San Juan R.
<br />(southwest) 22,707 640 1,600 AF 1868 7,500 8,140 1/
<br />McE1mo Cr. 1,286 34 42,600 2/
<br />Mancos R. 42,814 335 11,700 8,400 25,800 AF 1868 11,600 20,000 ]./
<br /> (1985)" 0
<br />La Plata R. 16,762 12,413 1,800 1,800 1/ c:.;>
<br />Animas R. 2,375 14,200 N.
<br />Florida R. 1,800 835 21,500 545 1,090 AF 1868 1,102 1,647 !:/ >>'-
<br /> (1976).... c.n
<br />San Juan R. W
<br />( central) 2,201 2,100
<br />Los Pinos R. 13,130 43,200 1./
<br />Piedra R. 1,446 433 7,800 600 1,850 AF 1868 600
<br /> 535 1,595 AF 1868 535
<br /> 61 183 AF 1868 61 2,/
<br />San Juan R. (1976)....
<br />(East) 1,499 126 13,700 1,317 3,876 AF 1868 1,317 !../
<br />Navajo R. 161 4,500
<br />Dolores R. 2,200 ~/
<br />TOTAL IN ACRES 93,051 14,893 175,913 34,100
<br />
<br />1/
<br />2/
<br />]./
<br />4/
<br />J./
<br />
<br />~/
<br />
<br />Dolores Proj: The Ute Mt. Tribe will receive 23,300 AF fpr irr.,' 1,000 AF for M&I, and 800 AF for recreation
<br />Present non-Indian lands irrigated from the Dolores River
<br />Animas-La Plata Proj: The Ute Mt. Tribe will receive 26,300 AF for irr. of 11,600 acres and 6,000 AF for M&I; the
<br />So. Ute Tribe will receive 3,400 AF for irr. of 1,800 acres and 26,500'AF for M&I
<br />Florida proj: The Indians will receive 2,553 AF for irr. of 1,102 acres including 835 acres presently irrigated
<br />The So. Ute Tribe received 213 cfs with an 1868 priority in 1930 to irrigate 16,966 acres including 31.3 cfs for
<br />allotments
<br />The So. Ute Tribe will receive a storage right on Stol1steimer Cr. for 1,850 AF with an 1868' priority/ and 1,850 AF
<br />refill with a 1986 priority to irrigate 600 acres, a direct flow right on the Piedra River to irrigate 535 acres with
<br />an 1868 priority, and a direct flow right to irrigate 61 acres on Devil Cr. with a 1976 priority
<br />The So. Ute Tribe will receive 1,530 AF from the San Juan R.; 975 AF from Round Meadow Cr., and 1,371 AF from Cat Cr.
<br />The Do1oree River ie the source of supply for the Dolores Project
<br />Subordinated '1868 to all rights adjudicated prior to January 1, 1985
<br />Subordinated ,1868 to all rights adjudicated prior to January I, 1976
<br />.....
<br />(The Tribea received a reserved project right for the Animas-La Plata and Dolores Projects with the date of priority
<br />to be the same as the Projects', and are to share on a pro-rata basis with the Projects' users.)
<br />
<br />7/
<br />8/
<br />-..
<br />....
<br />
|