My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09758
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09758
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:39 PM
Creation date
10/12/2006 3:54:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8224.700
Description
Missouri Basin - Pick Sloan Project - Annual Operating Plans and Reports
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1976
Author
DoI, BoR
Title
Annual Operating Plan Western Division Water Year Operations 1976 Water year Outlook 1977
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE OF CONTENTS <br /> <br />~ <br /> <br />Highlights of 1976 Operation. <br />Description of System . . . . <br />System Planning and Control . <br />Report on Operations for 1977 <br />Green Mountain Reservoir <br />Lake Granby and Willow Creek Reservoirs. <br />Eastern Slope Area - Colorado-Big Thompson Project <br />Seminoe and Kortes Reservoirs. . <br />Pathfinder Reservoir . . . . . . <br />Alcova and Gray Reef Reservoirs. <br />Glendo Reservoir . <br />Guernsey Reservoir . <br />Boysen Reservoir . ., <br />Buffalo Bill Reservoir <br />System Power Operation <br />Plans of Operation for 1977 -. <br />Plan of Operation for the October-January Period <br />The Operation Plan After February 1 If Most ,Probable <br />Inflow Were Forecast . . . . . . . . . . . . . <br />The Operation Plan After February 1 If Reasonable <br />Maximum Inflow Were Forecast . . . . . . . . . <br />The Operation Plan After February 1 If Reasonable <br />Minimum Inflow Were Forecast <br />Irrigation Requirements . . . . . . <br />Power Requirements. . .. . . . . . . <br />Minimum Required Reservoir Releases. <br />Operating Criteria For Green Mountain Reservoir <br /> <br />All Following Page 39 <br /> <br />LIST OF TABLES <br /> <br />j~ <br /> <br />1 - Flood Damages Prevented <br />2 - Actual Operations 1976 <br />3 - _Blue River Operat'ions 1976 <br />4A - Plan of Operation if Most Probable Inflow <br />Were Forecast <br />4B - Plan of Operation if Reasonable Maximum <br />Inflow Were Forecast <br />4C - Plan of Operation if Reasonable Minimum <br />Inflow Were Forecast <br />5 - Green Mountain Reservoir Operation 1977 <br />6 - North Platte Storage Ownership 1976 <br />7 - System Reservoir Data <br />8 - System Power and Pumping Data <br /> <br />3 <br /> <br />Page <br /> <br />5 <br />7 <br />8 <br />9 <br />9 <br />10 <br />10 <br />12 <br />13 <br />14 <br />15 <br />15 <br />16 <br />17 <br />18 <br />19 <br />19 <br /> <br />23 <br /> <br />28 <br /> <br />32 <br />35 <br />35 <br />36 <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.