Laserfiche WebLink
<br />Section <br />Number <br /> <br />I <br /> <br />II <br /> <br />III <br /> <br />. <br /> <br />. <br /> <br />Repo rt on <br />Colorado River Storage Project <br />Proposed Adjustment of Transmission and Power Rates <br /> <br />Table of Contents <br /> <br />Section and Subsection Titles <br /> <br />Letter of Transmittal <br />Engineering Seal <br /> <br />Overview and Conclusions <br />Introduction <br />Summary of Proposed Rate Increase <br />Review Procedure <br />Rate Setting Criteria of Western <br />Factors Contributing to Rate Increase <br />Summary of Results <br />Conclusions <br /> <br />Rate Proposal Issues <br />Irrigation Features of Participating Projects <br />Repayment of Storage Unit Irrigation Investment Costs <br />Determination of Replacement Coets <br />Projections of Salable Capacity <br />Depletions <br />Operation and Maintenence Expenses <br />Revenue Projects <br />Surplus Revenues <br /> <br />Study Results <br />Study A: Inclusion of Projects With Initial Water Ser- <br />vice Within Five Year Cost Evaluation Period <br />Study B: Step Rate Increases <br />Study C: Average Water Flow <br />Study D: Elimination of Depletions <br /> <br />Page <br />Number <br /> <br />I-I <br />1-2 <br />1-3 <br />1-5 <br />1-7 <br />1-9 <br />1-11 <br /> <br />II-I <br />II-I0 <br />II-12 <br />II-13 <br />II-16 <br />II-17 <br />II-20 <br />1I-22 <br /> <br />III-l <br />III-5 <br />1II-7 <br />II 1-8 <br />