My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09752
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09752
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:37 PM
Creation date
10/12/2006 3:54:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
1/1/1983
Author
RW Beck and Assoc.
Title
Report on Colorado River Storage Project Proposed Adjustment of Transmission and Power Rates
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />II-8 <br /> <br />Western's stated criteria with respect to the inclusion of partici- <br /> <br />pating irrigation projects in power repayment studies have been that if proj- <br /> <br />ects are once authorized (but have not necessarily received any construction <br /> <br />J <br /> <br />~...~~ <br />from Assumption Sheets and Project Data Sheets, as previously summarized, shows ,r~ <br />. O\iY <br />however that some projects or blocks are not progressing, many have estimate~~)~ <br /> <br />completion dates 10 or more years into the future, and some are not techniCallY~d'~~ <br /> <br />or economically fessible and may not be completed. For example, of the 14 proj- ~~(~; <br />;.,"J <br />'/) <br /> <br />The information available <br /> <br />appropriations by Congress) they must be included. <br /> <br />ects currently authorized but not completed, only two have a significant amount <br /> <br />(10%) of funding in 1982 and 8 have no funding at all in 1982. Only four are <br /> <br />10% or more complete. Also, of the 54 total blocks that make up the 14 proj- <br /> <br />ects currently authorized but not completed, only 9 are scheduled to be com- <br /> <br />pleted within 5 years and 12 are not scheduled to be completed until 10 years <br /> <br />or more into the future. Further, the Project Data Sheet for the Uintah proj- <br /> <br />ect contains the following statement: <br /> <br />"Funds to initiate preconstruction planning were appropriated in FY <br />1976. The data in this PF-65 are based on the plan presented in the August <br />1978 draft Definite Plan Report. However, since that time preconstruct ion <br />drilling has disclosed geological problems with both damsites and advance <br />planning studies have shown the plan is no longer engineering/economically <br />justified." <br /> <br />Wi th respect to the West Divide Project, a Bureau of Reclamation document en- <br /> <br />titled "Planning Report On The West Divide Project" contains the statement: <br /> <br />"The West Divide Project plan as presented in this report is not economic- <br />ally justified." <br />