My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09712
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:23 PM
Creation date
10/12/2006 3:50:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Date
5/4/1972
Author
US DoI BoR
Title
Draft EIS - Proposed North Side Collection System Fryingpan-Arkansas Project Colorado
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />( ~. .' <br />'i lV' 1.. ~.' <br /> <br />Collection System), the system consists of an arran~cment of <br /> <br />diversion dams, about 11.4 miles of buried conduits, and tunnels <br /> <br />above 10,000 feet ~cnn sea level desi~ec to intercept cmd trnns- <br /> <br />port an avera3e annual 18,400 acre-feet of runoff, from the <br /> <br />north tributaries of the Fryin~psn River. The actual annual <br /> <br />diversions l,ill vary from 5,900 acre-feet in a dry or 1011 flop <br /> <br />year to 30,500 acre-f~et in a wet or hiqh-flow year. The <br /> <br />authoriziu3 legisl~tiou provides for development of Lime Creek <br /> <br />and Last Chanc~ Creek which are also tributaries of the Fryinepan <br /> <br />River shauLl mlter be required in future years to meet overall <br /> <br />Project authorized div~rsion of an ~v8raee of 69,200 acre-feet <br /> <br />annually. <br /> <br />The North Side Syst~l'l will be desir,ned with the capability for <br /> <br />conveyinr, the Last ChnncG nnd Line Cr~ek diversions. This will <br /> <br />eliminate possible future disturbances to the environment that <br /> <br />would result from having to e]:~:L.'1ree the initial systeM.. The <br /> <br />foll~JinR narration d~scribes the major co~ponents of the North <br /> <br />Side Collection System. (See FiGure 3, North Side Collection <br /> <br />System Map). The narrative starts from initial point of co110c- <br /> <br />tiOl1 and cnds at th~ Charles H. Bouste3d. Tunnel. Diameter, <br /> <br />leneth and capacities of each component are listed in Fieure 4 <br /> <br />(Estimated Diam~ter-Length-Capacity of System F~atures). All <br /> <br />capacities citeJ ::Ire design capacities and do not necessarily <br /> <br />reflect actual divorsions. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.