Laserfiche WebLink
<br />Power Operations <br /> <br /> <br />Jpper Buln-Colorado Rlvar Sloraga ProJect <br /> <br />Juring water year 1982, a significant effort <br />vas made to complete National <br />;nvlronmental Policy Act compliance for the <br />lropased upratlng of generators at Glen <br />~anyon Powerplant, The. ?f()?O~ed upra\\ng <br />11 each of the eight generators from a <br />naxlmum capacity of 143,75 megawatts (MW) <br />o a maximum capacity of approximately <br />67.00 MW Involves replacing or relnsulatlng <br />leld wIndings. strengthening rotor arms, and <br />naklng mInor mechanical modifications such <br />IS changing the fan assembly to IncreBss <br />i1Tflow cooling. <br /> <br />n January 1982, a Draft Environmental <br />~ssessm8nt for Glen Canyon Powerplant <br />}pratlng was circulated for public comment. <br />)ue to adverse response to thIs document, <br />'rimarlly from environmental groups and the <br />Iver recreation tOmmunlty, Reclamation <br />ponsored a river trip In the GrB:nd Canyon <br />urlng the period of May 24-27, 1982, to aI/ow <br />"'lose people Involved In, or those people who <br />ould be affected by, an upratlng decision to <br />bssrve firsthand some of the potential <br />roblems which were Identified by those <br />ommentlng on the Draft Environmental <br />.ssessment. It was concluded that <br />;eclamatlon should InitIate a cooperative <br />ludy with the NPS to determine the Impact ot <br />1e present operation of Glen Canyon <br />owerplant on the Grand Canyon and to <br />Jrther assess various alternatives to the <br />resent operation. The results of this study <br /> <br />B <br /> <br />will ailow Reclamation to determine how best <br />to u5e the additional capacity. <br /> <br />The final Environmental Assessment on the <br />Glen Canyon Powerplant upratlng Is <br />scheduled \0 be's.ued by December 1982; a <br />decision as to whether to proceed with the <br />upratlng Is expected to follow shortly <br />thereafter. <br /> <br />The following table summarizes the CASP <br />generation, purchases, disposition, and <br />revenues from power operations for fiscal year <br />1982 and presents projections for fiscal year <br />1983, <br /> <br />The total revenue from power operations In <br />fiscal year 1982 was $81 ,263,038, For fiscal <br />year 1983, estimated revenues are <br />$85,000,000, <br /> <br />Water Year 1982 <br /> <br />Sources of Energy <br />Net Gen."Uon <br />Flaming Gorge <br />Blue Mesa <br />Morrow Point <br />Fontenelle <br />Glen Canyon <br />Crystal <br />Subtotal~Net Generation <br /> <br />Kllowltt-hours <br />433,017,000 <br />184,471,000 <br />261,986,000 <br />62,550,500 <br />3,881,478,000 <br />161,929,600 <br />4,985,432,100 <br /> <br /> <br />'" <br /><?,' ' <br />Blue Mesa Powerplant. <br /> <br />Purchases [forI <br />Parker Davis Firming <br />AID Grande Firming <br />CASP Firming <br />Fuel Replacement <br />Subtotal Purchases <br /> <br />MI.cellaneoul <br />TransmissIon for others <br />Exchange <br />Power Deliveries from <br />Others (Interchange) <br />TOIII Energy Recalplo <br /> <br />Dlsposlllon 01 Energy <br />Firm Energy Sales <br />Nonflrm Energy Sales <br />Power Dellv.ered to Others <br />(Interchange) <br />System Losses <br />Totll Energy DistrIbuted <br /> <br />Revenue <br />Firm Energy Sales <br />Nonflrm Energy Sales <br />(011 Conservation) <br />Parker Davis Firming <br />Wheeling tor Others <br />Miscellaneous Income <br />Total Revenue <br /> <br />Kllowltt-hours <br />o <br />o <br />1,054,899,302 <br />871 ,992,698 <br />1,926,892,000 <br /> <br />243,451,000 <br />27,892,000 <br /> <br />792,000,000 <br />7,975,467,100 <br /> <br />5,597,152,591 <br />871,992,898 <br /> <br />549,000,000 <br />957,321,811 <br />7,975,467,100 <br /> <br />$49,416,326,82 <br /> <br />28,550,098,77 <br />o <br />2,621,401.49 <br />675,211,35 <br />$81,263,038.43 <br />