My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09662
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09662
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:04 PM
Creation date
10/12/2006 3:48:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.120
Description
Colorado River Basin States Committee (AKA Colorado River Compact Commission)
Basin
Colorado Mainstem
Date
9/15/1952
Author
CRBSC
Title
Proceedings of the Meeting of the Colorado River Basin States Committee
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />13 <br /> <br />interests that are directly affected by tha~ contract. <br />, <br />I <br />MR. WILL: Just for information may I ask a question <br /> <br />in regard to those regulations? The regulations issued to dat , <br />I <br />I <br />are they said by the Federal Government to be complete? <br /> <br />MR. MOEUR: I couldn1t answer tha~ question. I know <br />I <br />in the first place that we were told beforel the regulations <br />I <br />I <br />were issued, we would be given an opportuni~y to go over them, <br />I <br />, I <br />and we were not given that opportunity; and, very recently ther <br />I <br />I <br />I <br />have been some more regulations. Joe Mansfaeld has been takin <br />I <br />I <br />care of that. He is one of the attorneys or the streamOom- <br />I <br /> <br />mission assigned that particular Job. <br />tion. Before I left I tried to get a <br /> <br />Joe ~as been on a vaca- <br />I <br />report from him and I <br />, <br /> <br />couldn't get it, so I can1t answer. <br /> <br />I <br />MR. MOEUR: That is what I was talking about. As I <br /> <br />, <br />remember, and I am not sure whether there was something in the <br />I <br />I <br />contract, but we were told that the rehabil~tation and the <br />I <br />extra work necessary to make it feasible from a power stand- <br /> <br />point, would be borne by Imperial. <br /> <br />The language, as I remembe <br />! <br />
The URL can be used to link to this page
Your browser does not support the video tag.