My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09657
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:02 PM
Creation date
10/12/2006 3:47:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.09B
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
1/1/1993
Author
BOR
Title
Operation of Glen Canyon Dam Draft Environmental Impact Statement
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Contents <br /> <br />General location map <br /> <br />Page <br />Frontispiece <br /> <br />Chapter I Purpose of and need for action <br />Background ' , . . , , , , <br />Cooperating agencies <br />Management responsibilities <br />Document organization <br />Location and setting <br />Grand Canyon National Park <br />Historical perspective ' , <br />Predam flows , , , . ' <br />Postdam flows (historic operations) <br />Glen Canyon Dam operations <br />Authorities and institutional constraints <br />Grand Canyon Protection Act of ]992 (Public Law 102-575) <br />Law of the River , <br />National parks <br />Environmental <br />Cultural preservation <br />Native American, , <br />Glen Canyon Environmental Studies <br />Phase I (] 982-88) , , . . , , <br />Phase II (]988-present), , . , <br />Relationship between Glen Canyon Dam EIS and Electric Power Marketing ElS <br />Scopingsummary , , . , , , . , . , <br />Public issues and concerns , , . ' <br />Significant issues identified for detailed analysis <br /> <br />] <br />2 <br />3 <br />4 <br />5 <br />5 <br />5 <br />6 <br />6 <br />6 <br />6 <br />7 <br />8 <br />8 <br />8 <br />9 <br />9 <br />9 <br />9 <br />10 <br />10 <br />11 <br />11 <br />11 <br />12 <br /> <br />Chapter II Description of alternatives <br />Process used to formulate alternatives <br />Alternatives considered in detail <br />Unrestricted fluctuating flows <br />No Action Alternative . , <br />Maximum Powerplant Capacity Alternative <br />Restricted fluctuating flows , ' <br />High Fluctuating Flow Alternative <br />Moderate Fluctuating Flow Alternative <br />Modified Low Fluctuating Flow Alternative (Preferred Alternative) <br />Interim Low Fluctuating Flow Alternative , <br />Steady flows . . . , , , , <br />Existing Monthly Volume Steady Flow Alternative <br />Seasonally Adjusted Steady Flow Alternative <br />Year-Round Steady Flow Alternative <br />Common elements . , , , , . ' <br />Adaptive management <br />Monitoring and protecting cultural resources <br />Flood frequency reduction measures <br />Beach/habitat-building flows <br /> <br />]5 <br />]5 <br />]6 <br />]6 <br />]6 <br />24 <br />24 <br />26 <br />27 <br />27 <br />30 <br />30 <br />32 <br />33 <br />33 <br />34 <br />34 <br />35 <br />36 <br />36 <br /> <br />iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.