My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09644
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:54:57 PM
Creation date
10/12/2006 3:46:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.21
Description
UCRBRIP Hatchery Facilities
State
CO
Basin
Colorado Mainstem
Date
4/6/1998
Author
CWCB/DOW/FishPro
Title
Draft Native Aquatic Species Feasibility Summary Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. evaluating the relative importance of the diverse opportunities to restore these species <br />and their habitat to self-sustaining levels; <br /> <br />. determining the approximate numbers of individuals of these species that would need <br />to be reared; <br /> <br />. determining habitat restoration or protection measures needed to recover these <br />species; <br /> <br />. determining the research, broodstock, production and grow-out capabilities needed to <br />raise sufficient numbers of each species to support the augmentation or reintroduction <br />of their population; and <br /> <br />. determining the facility staffing and budget needs to operate the NASF. <br /> <br />Opportunity will be provided for public review and comment on the Comprehensive Plan <br />prior to adoption by the CWC. <br /> <br />Contents of This Report <br /> <br />This report is organized as follows: <br /> <br />Section I. Introduction. gives an overview of the purpose of this report, the need <br />for and purpose of the project as well as the authorizations by the funding <br />agencies; <br /> <br />Section 2. Development and Analvsis of Alternatives. provides a description of <br />the process leading to a preliminary design and cost estimate for a NASF at the <br />Chiles Farms site; <br /> <br />Section 3. Description of the Selected Alternative, outlines the information in the <br />conceptual design report for the project as updated by discussions with CDOW <br />staff and the conceptual design report consultant; <br /> <br />Section 4. Water Supplv. provides a description of the potential sources of water <br />supply for the project; <br /> <br />Section 5. Financial Program. outlines the major funding considerations for the <br />project; and <br /> <br />Section 6. Conclusions and Recommendations, presents the conclusions and <br />recommendations of the CDOW and CWCB staffs regarding the proposed <br />facility. <br /> <br />1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.