Laserfiche WebLink
<br />) <br /> <br />Recommendations <br /> <br />Recommendations are offered here in two categories, technical and funding <br />recommendations: <br /> <br />Technical Recommendations <br /> <br />I. Phase I facility objectives should be clearly defined prior to initiation of the design <br />work. <br /> <br />2. Coordination amongst the various project participants and consultants in the design of <br />the project should be given a very high priority. <br /> <br />3. Video camera inspections and pumping tests of the existing wells should be <br />conducted, where physically possible, before finalizing the cost estimate for the <br />project. <br /> <br />4. Water quality from those wells that are proposed for facility use should be monitored <br />several times prior to the completion of design work. <br /> <br />To be completed <br /> <br />Funding Recommendations <br /> <br />To be completed <br /> <br />6.2 <br />