My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09611
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09611
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:54:46 PM
Creation date
10/12/2006 3:45:15 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8143.700
Description
John Martin Reservoir - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
2
Date
11/1/1993
Title
Annual Report of the Operations Secretary Concerning the Operation of John Martin Reservoir - 1993 - Part 1 of 2
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />" <br /> <br />c::> <br />'., ") <br />;.- <br />~ <br /> <br />....:i <br /> <br />December 8, 1992 <br /> <br />AGREEMENT <br /> <br />. , <br /> <br />1. This Agreement will expire November I, 1993, exoept that those <br />provisions of Paragraph S regarding trans fer of any exoess <br />water remaining in the Kansas transit loss acoount may be <br />deferred pending further oonsideration. <br /> <br />2. Kansas and Colorado will oooperate in all release rates to <br />secure the most efficient delivery of water to the Stateline <br />and to Kansas water users. <br /> <br />3. Credit for delivery to Kansas will stop at the Stateline 7 <br />days after the end of the run at John Martin Reservoir. No <br />credit for over-delivery will be determined for a run that <br />exceeds 100% of the Kansas account release. <br /> <br />4, <br /> <br />3a. In the event Kansas calls for a second run before the <br />first run's 7 days have elapsed, then there will be a <br />meeting between the Kansas Water Commissioner and the <br />Colorado Division Engineer to establish the delivery. <br /> <br />When the daily average flow at the Stateline exoeeds the <br />demand, delivery will be credited at not to exceed 105% of the <br />demand. <br /> <br />5, 35% of all "other water" will be transferred into Kansas <br />transit loss aocount. In the event that water in Kansas <br />transit loss aooount exceeds the transit loss at the end of <br />the irrigation year, the excess balance will be transferred <br />into the KanGas and Colorado storage accounts. <br /> <br />}~~~ <br /> <br />~Rude <br />Kansas State Board of Agriculture <br />Division of Water Resources <br /> <br />/1/!~ J t)l// <br /> <br />steven J, Witte . <br />Colorado Division Engineer <br />Division of Water Resouroes <br /> <br />-4- <br /> <br />1:" <br />
The URL can be used to link to this page
Your browser does not support the video tag.