My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09599
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:54:41 PM
Creation date
10/12/2006 3:44:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1985
Author
USDOI
Title
29th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />A preliminary allocation at total estimated <br />costs of all authorized projects is sum- <br />marized in this lable. <br /> <br />Allocations to the V3nous purposes <br />authorized under Reclamation Law are <br />required by Section 8 of Public Law 84- <br />485, Ihe Colorado River Storage Project <br />Act. excluding specifiC tish and wildlife and <br />recreation expenditures authorized by <br />Secllon 8 at tillS acl. Final allocation <br />reports have been prepared on the Colo- <br />rado River Slorage Project. and on Emery <br />County, Florida, Panonia, Seedskadee, Silt. <br />and Smith Fork Participating Projects, <br />and the Vernal Unit ot the Central Utah <br />Project. <br /> <br /> <br />'l,-.,_ <br />"'- <br /> <br />McPhee npcreallon Area shOWing boat lamp <br /> <br />Project Costs Allocated <br />(Excludes Section 8 <br />Costs) <br />Reimbursable Allocations <br />Irrigation <br />Power <br />Municipal & Indusfrial Water <br />Salinity Confrol <br />Other <br />Tofal <br />Nonreimbursable <br />Allocations: <br />Flood Control <br />Fish and Wildlife <br />Recreation <br />Road Relocafion Costs <br />Cultural Resources ActiVities <br />Safety of Dams <br />Salinity Control <br />Total <br /> <br />Other: <br />Navajo Indian <br />Irrigation Project' <br />Totat Cost Allocated <br />Section 8 Costs: <br />Fish and Witdlife <br />Recreation <br />Total Costs Not Allocated <br />Total <br /> <br />(Thousands <br /> <br /> <br />of Dollars) <br /> <br />$2,590.598 <br />1,187,450 <br />1,129,804 <br />7,512 <br />3,732 <br />$4,919,096 <br /> <br />$ <br /> <br />20,059 <br />319.767 <br />8,129 <br />42,187 <br />35,999 <br />11,428 <br />17,528 <br />$ 455,091 <br /> <br />, <br />'\ <br />\.. <br />\~ <br /> <br />/ <br />/ <br /> <br />, <br /> <br />-"'%:. <br /> <br />$ 526,650 <br />$5,900,843 <br /> <br />,.. <br />New boat ramp al Cl,Jrranl Creek ReserVOir. Bonneville Unit <br /> <br />$ 182,112 <br />173,280 <br />$ 355,392 <br />$6,256,235 <br /> <br />'nepaymcn! of COnstruction costs is subject to the act 01 July <br />1, 1932(47Stat. 564) <br /> <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.