Laserfiche WebLink
<br /> <br />1 <br /> <br />Funding <br /> <br />The fUnding of existing programs would need to be accelerated by <br />over threefold if all elements are to be completed by 1980. The <br />$720 million Central Arizona Project, representing nearly 50 percent <br />of the Federal portion of the regional early action program, is the <br />principal authorized project needing acceleration. <br /> <br />The funding schedule needed to catch up with the Region's devel- <br />opment needs has been spread over a 35-year period to year 2000. At that <br />time, the Region's backlog of needs would essentially be satisfied and <br />the 2000 to 2020 fUnding program would need only to satisfy the needs <br />arising during that 20-year period. <br /> <br /> 400 <br /> ~ NATIONAL OBLIGATION <br /> mIIITII REGIONAL NON-FEDERAL <br />~ 300 _ REGIONAL FEDERAL <br />...J <br /><l: <br />::> <br />z 86 <br />z <br /><l: <br />U) <br />Cl:: 200 <br /><l: <br />...J <br />...J <br />0 <br />Cl <br />Z <br />0 <br />...J <br />...J 100 <br />::E <br /> <br />30 <br />o 1965-1969 1966-1980 1981-2000 <br />(ACTUAL) <br /> <br /> <br />TIME FRAMES <br /> <br />34 <br />