My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09538
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:54:22 PM
Creation date
10/12/2006 3:41:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.300.10
Description
San Juan Recovery Implementation Program
Basin
San Juan/Dolores
Date
10/12/2000
Author
SJRIP
Title
San Juan River Basin Recovery Implementation Program Final Annual Budget and Work Plan Fiscal Year 2001
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />~ <br /> <br />Di~itize and process data utilizing GIS: Upon completion of each habitat mapping program (Objectives \ <br />I and 2), the field maps will be rectified and digitized into ArcCAD. <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />~ <br />I <br />E <br /> <br />Methods: <br /> <br />1. <br /> <br />Habitat mapping (San Juan River): One flight to collect digital aerial photography or videography will <br />be completed for the San Juan River from RM 180 to RM 0 and printed at an approximate scale of200 <br />ftlinch. Thirty-eight categories of aquatic habitat will be mapped in the field utilizing the digital <br />imagery as a base map. The flights and mapping will be completed as soon after runoff as flows reach <br />1,000 cfs or less and weather will allow. Field mapping will be completed at flows between 500 and <br />1,000 cfs if possible. <br /> <br />Two of every three miles will be mapped through the full reach, corresponding with the miles <br />designated for sampling under the other long term monitoring plans. <br /> <br />2. <br /> <br />Products: <br /> <br />An annual report and GIS coverages for inclusion in the GIS database will be produced under this task. The <br />annual report and coverages will be for the 2000 mapping, Reporting for the 200 I mapping will be in the 2002 <br />budget. <br /> <br />Budeet (Funded by BIA): <br />Category Cost <br />Labor $ 42,960.00 <br />Travel, per diem $ 3,250.00 <br />VehicIelEquipment Use $ 700,00 <br />Supplies $ 1,187.00 <br />Overhead $ 2,375.00 <br />TOTAL $ 50,472.00 <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.