My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09538
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09538
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:54:22 PM
Creation date
10/12/2006 3:41:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.300.10
Description
San Juan Recovery Implementation Program
Basin
San Juan/Dolores
Date
10/12/2000
Author
SJRIP
Title
San Juan River Basin Recovery Implementation Program Final Annual Budget and Work Plan Fiscal Year 2001
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Integrated Transponder) tags. Wild, adult Colorado pikeminnow will also be implanted with radio transmitters. <br />Notes will be kept on any parasites and/or abnormalities observed on coUected fishes. <br /> <br />Radio tag implantation and fish transport will follow the protocols attached to the San Juan River Seven Year <br />Research Plan (\991). Electroflshing will follow the methods set forth above and in the long term monitoring <br />pJan. Seining and trammel netting will be done where suitable habitat is available at the sampling crews' <br />discretion. The Service will have the lead for these adult monitoring trips and other cooperating agencies will <br />provide personnel and equipment as needed. Costs for cooperating agencies are not included in this budget. <br /> <br />Products: <br /> <br />An interim progress report for the adult monitoring trip conducted in 200 I is scheduled to be available by 31 <br />March 2002. The "draft final" of this report, which incorporates comments received, is scheduled to be <br />completed by I June 2002. DBASE IV files containing information on total catch and length/weight data <br />gathered on adult monitoring trips will be submitted to Keller-Bliesner Engineering for inclusion on the San <br />Juan River Recovery Implementation Program integrated database CD-ROM by 31 March 2002. <br /> <br />Bud~et: <br /> <br />Personnel costs <br />I GM-I4 Supervisor <br />1 GS-II Fishery Biologist <br />I GS- 7 Administrative Support <br /> <br />Data analysis and report costs <br /> <br />$ 6,000 <br />$15,000 <br />$ 1,500 <br /> <br />$ 5,000 <br /> <br />Travel-Per Diem <br /> <br />$ 6,500 <br /> <br />Equipment and Supplies <br /> <br />$ 3.000 <br />$37,000 <br /> <br />Subtotal <br /> <br />Service Administrative Overhead (20.00%) <br /> <br />$ 7.400 <br /> <br />U.S. Fish and Wildlife-CRFP Subtotal <br /> <br />$44,400 <br /> <br />Funding for participation of other agencies <br />New Mexico Dept. of Game and Fish-Santa Fe <br />U.S. Fish and Wildlife Service-Albuquerque <br />Utah Division of Wildlife Resources-Moab <br /> <br />$ 2,000 <br />$ 4,000 <br />$ 4.000 <br /> <br />GRAND TOTAL <br /> <br />$ 54,400 <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.