Laserfiche WebLink
<br />9. GAGING STATIONS <br /> <br />1=-- <br />I-d- <br /> <br />Emphasis was continued on performing additional field work to <br />increase the accuracy of the records and on providing current <br />streamflow data to the Administration and State officials as required. <br />In general, !iotreamflow records of satisfactory accuracy were obtained at <br />the Compact stations. except at the station on the Arkansas River at <br />Las Animas where construction of a new bridge caused much <br />interference with stage-discharge relationships. <br />It will be noted that there are differences in the releases from the <br />reservoir, as measured at the gaging station, and the daily demands by <br />Colorado and Kansas. Perfect agreement cannot be obtained, but the <br />differences could be minimized by relocating the gaging station nearer <br />to the dam and installing an artificial control. This would stabilize the <br />rating and also reduce the time involved in adjusting the gates to the <br />required release. <br />The Parshall flume on Frontier ditch was found to be in bad <br />shape so the construction of new stilling wells was delayed ,until a new <br />flume could be installed. A new flume has been received and will be <br />installed in December 1973. The stilling wells will be rebuilt at the same <br />time. <br />The Administration approved a cooperative agreement with the <br />U. S. Geological Survey for ~he fiscal. year July 1. 1973 to June 30, <br />1974, in the amount of $8,000; $4,000 for each party. These funds are <br />for the operation of the Compact station at Lamar, the additionaUield <br />work at the other Compact stations, the maintenance of the radio <br />equipment, the providing of current streamflow data, and the <br />preparation of records for the Annual Report. <br /> <br />10. Findings of fact by the Administration <br /> <br />SPECIAL TELEPHONIC MEETING <br />JUNE 22, 1973 <br />A special telephonic meeting was held on June 22, 1973 in <br />accordance with Article V F of the Compact, for the purpose of <br />declaring that the reservoir would become empty on June 25, 1973. Mr. <br />C. J. Kuiper, Colorado State Engineer, and Rudy Styduhar, Division <br />Engineer, were notified of the action and that administration of <br />decreed water right'.i for Colorado would commence on June 25,1973, <br />unless a change of conditions justified cancellation or modification of <br />thi'.i notice. <br />The reservoir became empty at 6:00 p.m.. June 25, 1973. <br />Participating members: <br />For Colorado - Mr. Reedy and Mr. Reyher <br />For Kansas - Mr. Bentrup and Mr. Green <br /> <br />SPECIAL TELEPHON 'c MEETING <br />JULY 23,1973 <br /> <br />A speCial telephonic meeting was held on July 23, 1973 in <br />accordance with Article V F of the Compact, for the purpose of <br />declaring that the reservoir would become empty on July 26. 1973. Mr. <br />C. J. Kuiper, Colorado State Engineer, and Mr. Rudy Styduhar <br />Division Engineer, were notified of the action and that administratio~ <br />of decreed water rights for Colorado would ccmmence on July 26, <br />1973, unless a change of conditions justified cancellation or <br />modification of this notice. <br />The reservoir became empty at 12:01 a.m. July 26,1973. <br />Participating members: <br />For Colorado - Mr. Reedy and Mr. Reyher <br />For Kansas - Mr. Bentrup and Mr. Green <br /> <br />-9- <br />