Laserfiche WebLink
<br />s~' r~ <br />L-<>~6-~"-I1'~ J.....--:f':fUiS~) <br />G:;"f--d.A.L Id-'V',P. "., ~ <br />Bureau of Reclamatio;' ~ I~\\ -\ <br />. , <br />("t.... ,q~!~ i <br />~~f',~" /;.>1 .~ <br />~ 'Y~Ce. r <br />News Release !:>; AI <br />0/:, '/ <br />Upper Colorado Region ' OJ <br /> <br />Grand Junction Projects Office <br />Grand Junction, Colorado <br />Brent Uilenb;~ 248-0618 <br />For Release 1~ 1994 <br /> <br />(,1;= <br /> <br /> <br />r~~ j~:i~~/0-4 <br /> <br />,':::::;____ ,__ .__t <br /> <br /> <br />MONTROSE/DELTA COUNTY PROPOSED <br />SALINITY CONTROL PROJECT PUT ON HOLD <br /> <br />The Bureau of Reclamation has put on hold its proposal to <br /> <br />place approximately 195 miles of irrigation ditches and 7 miles <br /> <br />of canals in pipe in Montrose and Delta counties. The area, <br /> <br />located east of the Uncompahgre River, is part of the Lower <br /> <br />Gunnison Basin Unit, East Side Lateral Project. <br /> <br />Last summer, Reclamation released a draft environmental <br /> <br />assessment (EA) for the proposed project and, until recently, was <br /> <br />preparing the final EA. <br /> <br />In January, it was determined that units (inClUding the East <br />Side Lateral) authorized by congress under the colorado River <br />Basin Salinity control Act were near their funding ceiling. The <br />result is that Reclamation and the seven Colorado River Basin <br />States involved in the salinity control project are conducting a <br />review to prio~itize remaining work and match that priority list <br />against remaining funds that congress had authorized to be spent. <br />Since the East Side Lateral project was only a proposal, the <br />decision was made to put the project on hold pending the results <br />of the review. <br /> <br />There is still a chance that congress could raise the <br />ceiling on salinity control to include the East side Lateral <br />project. <br /> <br />Reclamation plans to complete the Lower Gunnison Basin Unit <br />winter-stock water project currently underway in the Montrose and <br />Delta area. <br /> <br /># # # <br /> <br />001077 <br />