<br /> <br /> <br />000375 <br /> <br /> <br />. <br /> <br />. <br /> <br />modification work and installation of Government-furnished steel <br />liner panels will be taken shortly after the stilling basin is de- <br />watered. The repair work will be scheduled for completion before the <br />1968 spring flood season. <br /> <br />The Silt project is expected to provide irrigation service this <br />spring. The pumping plant, the canals, and laterals will be ready <br />for use following the final testing and construction cleanup. We ex- <br />pect that all contract work will be completed on Rifle Gap Dam within <br />the next 30 to 60 days. Reservoir storage was started late in Novem- <br />ber 1966, and the dead storage pool has been filled. The relocated <br />Colorado State Highway No. 325 was opened to public traffic on <br />January 27. This road will be surfaced during the coming spring. <br /> <br />The diversion works for the Smith Fork Feeder Canal of the Smith <br />Fork Project have not performed satisfactorily due to the excessive <br />sediment carried by the stream. We were asked to modify the diversion <br />structure, and a contract for this work was recently awarded. The <br />work should be finished early this spring. <br /> <br />The construction status of the Bostwick Park Project has not <br />changed appreciably since our last report to you. In mid-November <br />the contractor suspended operations for the winter and has not yet <br />resumed work. Last fall the damsite area was cleared and stripping <br />operations were nearly completed before the heavy snowstorms made <br />further work impractical. We propose to take bids early in 1968 for <br />constructing about 12 miles of new laterals to serve the project area. <br /> <br />Repairs to the lining of the Gunnison Tunnel on the Uncompahgre <br />Project are progressing according to schedule. This concrete had be- <br />come greatly weakened by cracking and was in need of steel sets <br />through most of its length. During the construction season some <br />difficulty was experienced with slight vertical settling of the sets, <br />but this was corrected when the first invert was installed. The con- <br />tract is now about 65 percent completed. The tunnel will be ready <br />for water delivery this spring. <br /> <br />Of great significance in our expansion of the Colorado River <br />~fStorage Project construction program is the start of construction on <br />J/the $325 million Bonneville Unit of the Central Utah Project. Bids <br />were opened on February 16 for construction of the 2,920-foot-long, <br />l50-foot-high Starvation Dam near Duchesne, Utah. An apparent low <br />bid of $8,182,750 was received. Award of the contract is pending. <br />Bids were also opened during February for the Knight Diversion Dam on <br />the Duchesne River and for the Starvation Feeder Conduit which will <br />convey water from the Knight Diversion Dam over to Starvation Reser- <br />voir. The Starvation Feeder Conduit is approximately one mile long <br />and will consist of a concrete-lined tunnel about 7 feet in diameter. <br />Total construction cost of the Starvation complex is estimated to be <br />about $20 million. <br /> <br />2 <br />