Laserfiche WebLink
<br />... <br /> <br /> <br />" <br />, <br /> <br />>-, <br />Ut <br />W <br />> - <br /> <br />" <br /> <br />~ <br /> <br />, <br /> <br />'" <br /> <br />~, <br /> <br />J; <br /> <br />,. <br /> <br />PICTURE NO.2 <br /> <br />The cost of construct ion is about the same but those drops in <br />the ditch take a lot of time because they are hand formed. Also they <br />create a potenti::JI .....eakness in the structure where cracking is apt to <br />occur. <br /> <br />There are also two methods being used to place the ports Idthin <br />the ditches. The first is to place those small metal gates on the <br />level and in the wet cement. 3S shown below. <br /> <br /> <br />Afteniards 2" Poly Ethlene pipes are cut <br />of the gates and through the ditch bank. <br /> <br />and made to fit over the ends <br />This process costs about $1.55 <br /> <br />- l(, - <br />