Laserfiche WebLink
<br />3306 <br /> <br />SUBGOAL WEIGHTING PROCESS <br />Evaluation of Arkansas Basin Storage Alternatives <br />10-Jun-98 <br /> <br />GOAL: Minimize Overall Costs <br />SUBGOALS: Minimize Capital Cost <br /> Minimize Total Cost <br /> Higher importance for Higher importance for Point Pair <br /> ~ Capital Cost Total Cost ~ Selected <br />Minimize Capital Cost 9 8 7 6 5 4 3 2 1 rn S' <br />Minimize Total Cost 1 2 3 4 5 6 7 8 9 5 <br />Criteria Total Points Weight % <br />Minimize Capital Cost t:'~ <br />Minimize Total Cost 50 <br /> SUM = 10 100 <br /> <br />GEl Consultants, Inc, <br />Project 95328 <br /> <br />COSTXLS <br /> <br />Ballot No, 3 <br />