Laserfiche WebLink
<br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br /> <br />DRAFT <br /> <br />') <br /> <br />N REFERENCE <br />, <br />e') <br />Q <br />Colorado Water Conservation Board, September 2000, Phase 1 Coordin(lted Facilities Water <br />Availability Study for the Endangered Fishes of the Upper Colorado River, <br /> <br />Colorado Water Conservation Board, March 2001, Technical Memorandum 4, Analysis of <br />Alternative 4, New Storage Facilities Below Shoshone, <br /> <br />Dwyer-Shepherd Engineers, February 1976, Rifle Ski Corporation, Webster Hill Reservoir, <br />Preliminary Engineering Evaluation, <br /> <br />p:\data\gen\cwcb\19665\altemative4\techmem04\tecbmem04a\techmem04a.doc <br /> <br />7 <br />