My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09467
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:50 PM
Creation date
10/12/2006 3:39:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8281.990
Description
Colorado River Studies and Investigations -- Webster Hill Dam and Reservoir
Basin
Colorado Mainstem
Water Division
5
Date
6/1/2001
Author
Brown and Caldwell
Title
Technical Memo NO 4A: Analysis of Alternative 4 - New Storage Facility at Webster Hill Site - Mainstem Colorado River
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />'I <br />II <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br /> <br />o <br /> <br />(.~ ) <br /> <br />DRAFT <br /> <br />N <br />c') <br />e.n <br />O'J <br /> <br />INTRODUCTION AND PURPOSE <br /> <br />The Phase 1 investigation (CWCB, September 2000) recommended that six possible reservoir sites <br />downstream from the Shoshone Power Plant be investigated for feasibility for supplying the <br />20,000 acre-feet release. These reservoir sites include: . <br /> <br />. Alternative 4f, Roan Creek, <br />. Alternative 4g, Mt. Logan, <br />. Alternative 4k, Dry Hollow Creek, <br />. Alternative 4m, Colorado River Main Stern, <br />. Alternative 4n, Parachute Creek and <br />. Alternative 40, Starky Gulch, <br /> <br />These sites were analyzed in Technical Memorandwn 4 (CWCB, March 2001). After review and <br />discussion of these alternatives; the Executive Committee made the following fmdings and <br />directions: <br /> <br />. The tributary sites (4[, 4g, 4k, 4n, and 40) were found to be of questionable economic <br />feasibility and were dismissed from further consideration. <br />. Further analysis of the economic feasibility of the mainstem site, Alternative 4m, was <br />directed. <br /> <br />The purpose of Technical Memorandwn 4a is to report on the findings of this additional economic <br />analysis. <br /> <br />- .\.l~...\.......\.......lo.\ 1 O';';'oC;\f1Urm::.tive4\techmem04\techmem04a\techmem04a.doc <br />, <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.