<br />
<br />II
<br />II
<br />I
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />I
<br />.
<br />.
<br />I
<br />I
<br />I
<br />I
<br />,I
<br />I
<br />
<br />Table 1
<br />Estimated Water Availability to a Junior Water Right Diverting from the Colorado River
<br />at the Webster Hill Reservoir Site
<br />
<br />o
<br />. ..)
<br />N
<br />,"')
<br />c.n
<br />-..J
<br />
<br /> 20,000 AF Is it possible to
<br /> Water Available Release Refill in July & Greater than
<br />Date (AF) Required? August? 200 cfs?
<br />3/1/90 37,534 ves .
<br />4/1/90 4,969 ves
<br />5/1/90 75,357 yes
<br />6/1/90 275,724 yes
<br />7/1/90 62,808 ves
<br />8/1/9.0 5,363 yes
<br />9/1/90 4.120 ves
<br />10/1/90 3,126 ves
<br />11/1/9.0 52,864 yes
<br />12/1/90 30,435 ves
<br />1/1/91 38,956 ves
<br />2/1/91 31,976 yes
<br />3/1/91 40,380 ves
<br />4/1/91 14,819 yes
<br />5/1/91 295,109 ves
<br />6/1/91 478,984 ves yes yes
<br />7/1/91 124,131 ves
<br />8/1/91 29,649 yes
<br />9/1/91 27,372 ves
<br />10/1/91 7,226 yes
<br />11/1/91 76,494 ves
<br />12/1/91 51,3.09 yes
<br />1/1/92 39,932 yes
<br />2/1/92 40,918 ves
<br />3/1/92 57,66.0 yes
<br />4/1/92 5.0,387 yes
<br />5/1/92 263,56.0 ves
<br />6/1/92 172,648 yes
<br />7/1/92 59,90.0 ves
<br />8/1/92 34,297 yes
<br />9/1/92 2.0,579 ves
<br />10/1/92 2.676 yes
<br />11/1/92 77,894 ves
<br />12/1/92 48,382 ves
<br />1/1/93 41,78.0 yes
<br />2/1/93 37,966 ves
<br />3/1/93 75,651 ves
<br />4/1/93 82,061 yes
<br />5/1/93 752,871 yes
<br />6/1/93 870,.054 ves
<br />7/1/93 378,119 yes
<br />8/1/93 86,971 yes
<br />9/1/93 45,121 yes
<br />1.0/1/93 37,859 ves
<br />11/1/93 87,746 yes
<br />12/1/93 73,.058 ves
<br />1/1/94 7.0,4.04 ves
<br />
<br />p:ldatalgenlcwcb\ 19665\altematlve4\techmem04\lechmem04altables techmem04.xls
<br />
<br />Page 7
<br />
|