My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09411
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:25 PM
Creation date
10/12/2006 3:37:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.105.I
Description
Colorado River-Water Projects-Navajo-Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/3000
Title
Navajo Dam EIS-Study and Implementation of Increased Operational Efficiencies in Hydroelectric Power Projects-Summary
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SEe. 6403. STUDY AND IMPLEMENTATION OF INCREASED <br />OPERATIONAL EFFICIENCIES IN HYDROELECTRIC POWER <br />PROJECTS. <br /> <br />, ~ T'tI.' ........Y"'...TT""T"o. T 'T'1 C".. .L_.. _.....T...._..:_n _1-_11 ___....1.._.. ~ _~.....1.. ~C'~.~~_~~:~....nl """,ntl,^rI" <br />la) ll~ UC1'\jCK..J-\L- lilt: ,:)t:\.:Lt:LaIY UL UIlI;;IIUI ~1I(1I11,VIIUU~L a :::>lUuy VI Up~la\1UIHlI 1Il\."U1VU.l <br />and water scheduling techniques at all hydroelectric power plants under the administrative <br />jurisdiction of the Secretary that have an electric power production capacity greater than 50 <br />megawatts, tOn <br /> <br />(1) detennine whether such power plants and associated river systems are operated so <br />as to maximize energy and capacity capabilities; and <br /> <br />(2) identify measures that can be taken to improve operational flexibility at such <br />plants to achieve such maximization. <br /> <br />(b) REPORT- The Secretary shall submit a report on the findings, conclusions, and <br />recommendations of the study under this section by not later than 18 months after the date of <br />the enactment of this Act, including a summary of the detem1inations and identifications <br />under paragraphs (1) and (2) of subsection (a). <br /> <br />(c) COOPERATION BY FEDERAL POWER MARKETING ADMINISTRATI0NS- The <br />Secretary shall coordinate with the Administrator of each Federal power marketing <br />administration in-- <br /> <br />(1) detem1ining how the value of electric power produced by each hydroelectric <br />power facility that produces power marketed by the administration can be maximized; <br />and <br /> <br />(2) implementing measures identified under subsection (a)(2). <br /> <br />(d) LIMITATION ON IMPLEMENTATION OF MEASURES-Implementation under <br />subsections (a)(2) and (b)(2) shall be limited to those measures that can be implemented <br />within the constraints imposed on Department of the Interior facilities by other uses required <br />by law. <br /> <br />00165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.