Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br /> <br />275:::, <br /> <br />7. <br /> <br />WATER RIGHT <br /> <br />Colorado Canal Company, Lake Meredith Company, Lake Henry <br />Company Water Rights <br /> <br />CASE NUMBER - 86CW62, 84CW63, 84CW64 (Water Division 2) <br /> <br />TOTAL ACRES - 47,373 acres in system in 1986; 50,000 to 56,000 in 1977 <br /> <br />TOTAL MOVED - <br /> <br />approximately 40,000 acres <br /> <br />% MOVED <br /> <br />approximately 86% <br /> <br />ACREAGE DRIED UP TO DATE - approximately 40,000 acres; approximately 6,868 acres <br />remain in irrigation, approximately 22,000 acres are in the revegetation process. <br /> <br />FROM -Colorado Springs purchased from Foxley & Co. (corporate farmer) and Aurora <br />purchased from about 125 individual irrigators <br /> <br />TO - City of Colorado Springs and Aurora <br />1985-86 Colorado Springs <br />DATE 1986-87 Aurora <br /> <br />PRICE - Colorado Springs paid $27,500,000. at $1570/acre ft. <br />Aurora purchased 14,225.38 shares at approximately $1500 per share. Aurora <br />calculates each share will yield 0.6 ac. ft. consumptive use at the Otero pipeline diversion upstream. <br /> <br />DECREED TERMS AND CONDITIONS - <br /> <br />1) delayed return flow required to continue benefiting Arkansas River <br /> <br />2) only historical consumptive use transfet;red <br /> <br />3) diversion at Colorado Canal headgate required to continue (use by Colorado Springs will <br />occur after upstream exchange from Lake Meredith) <br /> <br />4) Winter water storage in Pueblo Reservoir permitted provided that: <br /> <br />a) it only occur in winter storage period <br />b) 12% of water stored be released to river <br />c) storage in Pueblo Reservoir limited <br /> <br />5) Permanent dry up required for land irrigated by shares transferred to municipal use <br /> <br />6) measuring structures required <br /> <br />7) 5% of water required to remain in lateral <br /> <br />8) 12% of Lake Meredith water required to be released to remaining Lake Meredith owners <br /> <br />A2-11 <br />