My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09403
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:23 PM
Creation date
10/12/2006 3:36:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.A
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
3/12/1973
Author
CWCB
Title
Dolores Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />the reservoir at Great Cut Dike to the Dove Creek Canal. <br /> <br />Major diversions from the Dove Creek Canal for the Montezuma <br />Valley and Towaoc areas would be made near the canal head to the Great <br />Cut Canal and Narraguinnep Draw. In the Montezuma Valley area project <br />and nonproject water for irrigation and for municipal and industrial use <br />in Cortez would be delivered by the Great Cut Canal and existing laterals. <br />Water also would be conveyed by these works through the Montezuma Valley <br />area to the head of the Towaoc area. Project laterals and drains would <br />be constructed in the Towaoc area. Some existing conveyance works in the <br />140ntezuma Valle y area would be replaced by the Dove Creek and Great Cut <br />Canals. <br /> <br />In the Dove Creek area, the Dove Creek Canal and its major <br />branch, the South Canal, would deliver water to project lands and to three <br />terminal reservoirs that would be constructed to supplement project stor- <br />age at McPhee Reservoir. The Dove Creek Canal would provide water to <br />Cahone and Monument Creek Reservoirs and water from these reservoirs <br />would be distributed by Cahone Canal and Monument Creek lateral, respec- <br />tively. The South Canal would provide water to Ruin Canyon Reservoir. <br />Water from this reservoir would be distributed by the Hovenweep Canal and <br />Cross Canyon lateral. Laterals and drains would be constructed on proj- <br />ect lands in the Dove Creek area. Water would be made available for <br />Dove Creek at Monument Creek Reservoir. <br /> <br />Fisheries and recreational developments would be provided at <br />project reservoirs. Project funds would be provided for mitigation of <br />big game losses caused by the project. <br /> <br />proiect Costs (Estimated) <br /> <br />Municipal and industrial water <br /> <br />$ 4,259,000 <br /> <br />Irrigation <br /> <br />79,799,000 <br /> <br />Fish and wildlife <br /> <br />3,687,500 <br /> <br />Recreation <br /> <br />1,126,400 <br /> <br />Water quality <br /> <br />308,100 <br /> <br />Flood control <br /> <br />820.000 <br /> <br />Total Cost <br /> <br />$90,000,000 <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.