My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09344
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:01 PM
Creation date
10/12/2006 3:35:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin General Publications - Missouri River General Publications
State
CO
Basin
South Platte
Water Division
1
Date
9/1/1974
Author
USWRC
Title
1975 Water Assessment - Guidelines for Conducting Phase II - Specific Problem Analysis - Enclosure C
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />30 <br /> <br />S"b-d.cthity 18 - Dllring this s~lb-activity the Regional Sponsur will <br />prov:de the draft Specific Problem Analysis report for regionwide <br />review. The COlUlcil suggests that the participants in this activity <br />be the same individuals who reviewed both the initial problem list in <br />Activity One and the Regional Preference Future in Activity Two ( Gr:J'Jp B). <br /> <br />The Study Director will be responsible for notifying the appropriate <br />participants regarding this activity, "nj for providing the participants veith <br />the draft report along with explanatory materials for suggesting a format <br />for review responses. This review process may occur through separate <br />mailings to the individual participants, meetings of the participants, or <br />some combination of both. <br /> <br />The Study Director and his staff or work group will be responsible for <br />collecting the review responses; analyzing them, and updating the draft <br />report as appropriate for consideration by the policy group. <br /> <br />Sub-activity 19 - During this sub-activity the Regional Sponsor will <br />finalize the Specific Problem Analysis Report for submittal to the WRC. <br /> <br />As discussed earlier, the policy group should review the draft report, <br />modify it as necessary and then with staff/work group assistance, <br />propose a final draft for approval by the total sponsoring organization <br />(the Commission, the inter-agency committee, etc.) and transmittal <br />to W RC. <br /> <br />e <br /> <br />e <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.