My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'" <br />co <br />C'". <br />C\J <br />c: <br /> <br />1 and determinations shall be final and binding as to the Operating <br /> <br />2 Agents. <br /> <br />3 <br /> <br />(b) All D1structions, directions and determinations <br /> <br />" <br /> <br />4 of the Director or the Secretary given or made pursuant to the <br /> <br />5 terms hereof shall be complied with by the Operating Agent affected <br /> <br />6 unless and until reversed or modified upon appeal to the Secretary <br /> <br />7 or upon arbitration or court proceedings, as herein provided, but <br /> <br />8 neither such requirement of compliance by such Operating Agent, <br /> <br />9 nor anything in this contract contained, shall preclude either of <br /> <br />10 the said Operating Agents, in their respective capacities as <br /> <br />11 allottees or contractors for electrical energy, from lnaking any <br /> <br />12 objection, claim or assertion of right which any other allottee <br /> <br />13 might make under similar conditions, it being the intention of the <br /> <br />14 parties that this contract shall define the rights, powers and <br /> <br />15 duties of the Operating Agents, as such, without in any manner <br /> <br />16 impairing their rights, powers and duties as allottees or contractors <br /> <br />17 for electrical energy. <br /> <br />18 <br /> <br />(c) J\Ily instruction, direction or determination of the <br /> <br />19 Secretary involving or relating to the interpretation or performance <br /> <br />20 of this contract, or of any amendment hereof or supplement hereto, <br /> <br />21 shall be subject to arbitration or court proceedings only if it <br /> <br />22 (i) impairs the rights or extends the <br /> <br />23 obligations of the City or Edison Company <br /> <br />24 under any contract or contracts, other <br /> <br />25 than this contract, between the City and <br /> <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.