My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />~ <br />C" <br />C'.' <br /> <br />c <br /> <br />1 and opportunity to be heard, in order to insure the <br /> <br />2 availability of generating units for service to the <br /> <br />3 allot tees for whom the Operating Agents, respectively, <br /> <br />4 are required hereunder to generate energy. By mutual <br /> <br />5 consent of the Secretar'J and the Operating Agents, either <br /> <br />6 of said lists of properties may also be amended, from time <br /> <br />7 to time, after notice to all other allottees and opportunity <br /> <br />8 to be heard, by adding thereto, or eliminating therefrom, <br /> <br />9 units or items of properties; pro'nded, however, that if, <br /> <br />10 in the case of any new unit or item of property not thereto- <br /> <br />11 fore included in either of said lists, such mutual consent <br /> <br />12 shall not be given, said i tern sOOll be added to the one of <br /> <br />13 said lists desi gna ted by the Secretary. The obligation of <br /> <br />14 the Operating Agents with respect to operation, maintenance, <br /> <br />15 and renlacements shall not commence as to any structur0s, <br /> <br />16 equipment, or facilities comprising a portion of Boulder <br /> <br />17 Power Plant which may be in the course of construction or <br /> <br />18 installation by the United States at the time of the taking <br /> <br />19 effect of this contract, or which rnBY thereafter be constructed <br /> <br />20 or installed by the United States, unless otherwise agreed <br /> <br />21 between the Operating Agent affected and the Director of <br /> <br />22 Power appointed by the Secretary (hereinafter referred to as <br /> <br />23 lIDirectorll), until such structures, equipment, or facilities <br /> <br />24 shall have been fully constructed and installed, and the <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.