Laserfiche WebLink
<br />518 <br /> <br />. <br /> <br />Construction period: ,1913-15. Bypass bore <br />constructed around collapsed eection <br />in 1950. <br />Length .................._.............. <br />Diversion capacity....................... <br />Cross section: Horseshoe lorlginal tunnel I <br />Height ... .... ............ ..... ......... <br />Width.................................. <br />Lining: Concrete, thickness. . . . . . . . . . . . . . . . <br /> <br />ORCHARD MESA POWER CANAL <br /> <br />Location: From Government High Line Canal <br />between Tunnels No.2 and 3 across river <br />through Orchard Mesa Siphon and gener- <br />ally lOuth to Grand Valley Powerplant and <br />Orchard Mesa Pumping Plant. <br />Construction period: 1922-24 <br />Length.......... ,..... ...... ....... .... <br />Divenlion capacity.... ,_ ...... ... .....".. <br />Typical maximum section-open cimal: <br />Bottom width.................,......... <br />Side slopes.............................. <br />~;ater depth............................ <br />Lining thickness. ........................ <br />Typical maximum section-bench flume: <br />Bottom width ............ ............... <br />Side slopes: Yertical <br />\\,'ater depth............................ <br />Wall thickness: <br />Top.................................... <br />Bottom ................................. <br />Typical maximum section-cut and cover <br />conduit: <br />Bottom width .......... ...... ....... .... <br />Height................................ . <br />Side slopes: Vertical <br />W'ater depth............................ <br />Concrete thickne88: <br />Bottom................................. <br />Sidewall... ............. ................ <br /> <br />MANN"S GULCH SIPHON (ORCHARD MESA POWER CANAL) <br /> <br />Location: Station 57+87 on the canal. about <br />1.5 miles east of Palisade, Colo. <br />Type: Reinforced monolithic conerete <br />Length........ .u.. ...........u....... <br />Capacity........ .... ....... ............ <br />Cross section: Circular <br />Diameter ...... .... ........... .......... <br /> <br />Grand Valley Project <br /> <br />. <br /> <br />7.486 It <br />730 fe/s <br />11 It <br />1LS It <br />4 in <br /> <br />3.5 mi <br />800 ftJ/s <br />20 It <br />1:1 <br />9.8 It <br />4 in <br />17 It <br />6.6 It <br />6 in <br />9 in <br />11 It <br />11.4 It <br />10.3 It <br />10 in <br />9 in <br /> <br />193 It <br />800 fPls <br /> <br />12 It <br /> <br />ApPLEGATE DRA'" SIPHON AND WASTEWAY (ORCHARD MEsA POWER <br />CANALl <br /> <br />Location: Station 139+ 14 on the canal. <br />about 0.5 mile southeast of Palisade. Colo. <br />Type: Twin-barrel reinforced monolithic <br />concrete <br />Length ...uu.u... uu.... u .......... <br />Capacity..... ...... ...... .,'.. ..... ..... <br />Cross section: Two 8.ft- square barrels <br /> <br />ORCHARD MESA CANAL No.1 <br /> <br />........~.from Orchard Mesa Pumping <br />Plant, ahout 0.5 mile south of Palisade. <br />Colo., southwesterly to a point about 1 <br />mile south of Grand Junction, Colo. <br />Length ...... .............. .Uu........ <br />Diversion capacity....... ........ ........ <br />Typical maximum section: <br />Bottom width. .......................... <br /> <br />140 It <br />800 ft3/s <br /> <br />15.5 mi <br />85 ft3/s <br /> <br />8 It <br /> <br />Side slopes.......... ..... ........ ....... <br />\l'ater depth ............................ <br /> <br />BIG W ASH SIPHON (ORCHARD MESA CANAL No.1) <br /> <br />Location: Station 3+ 18.4 on the canal. <br />Type: Precast concrete pipe <br />Length 'u...u.........._u..u.Uuu, <br />Capacity.......... ....... ...... ........ <br />Cross 8ection: Circular <br />Diameter ............. .................. <br /> <br />STEEL SIPHON /ORCHARD MESA CANAL No. 11 <br /> <br />Location: Station 4+50on the canal. <br />Type: Riveted plate steel <br />Length............... u....... u....... <br />Capacity ............................... <br />Cross section: Circular <br />Diameter............. ...... ............ <br /> <br />1.5:1 <br />3.1 It <br /> <br />780.6 It <br />80 ft3/s <br /> <br />4.5 ft <br /> <br />1,321.5 It <br />80 fels <br /> <br />DOUBLE WASH SIPHON No. ] (ORCHARD MESA CANAL No. II <br /> <br />4.5 It <br /> <br />Location: Station 346+62 on the canal. <br />Type: Precast concrete pipe <br />Length ._............ ....._ ........_.... <br />Capacity............ ............... .... <br />Cross section: Circular <br />Diameter... .................... ..; ..... <br /> <br />375.5 It <br />80 fels <br /> <br />DOUBLE WASH SIPHON No.2 lORCHARD MESA CANAL No.1 t <br /> <br />4.5 It <br /> <br />Location: Station 356+44 on the canal. <br />Type: Precast concrete pipe <br />Length .....................,......._... <br />Capacity.............................. . <br />Cross section: Circular <br />Diameter ............................... <br /> <br />CoNCRETE SIPHON WRCHARD MESA CANAL No. 11 <br /> <br />Location: Station 8+ 16 on the canal. <br />Type: Precast concrete pipe <br />Length ....,....... ..... .......... ...... <br />Capacit), .......... ..... ................ <br />Cross 8ection: Circular <br />Diameter................... ..,...... ... <br /> <br />ORCHARD MESA CANAL No.2 <br /> <br />Location: From orchard Mesa Pumping <br />Plant. about 0.5 mi south of Palisade. <br />Colo.. southwesterly to a point about 2.5 <br />mi southeast of Grand Junction. Colo. <br /> <br />Length .........._...................... <br />Diversion capacity. ....... ...;.... ....... <br />Typical maximum section: <br />Bottom width ........ ........ ........... <br />Side slopes.............................. <br />W'ater depth...............;............ <br /> <br />STEEL SIPHON (ORCHARD MESA CANAL No.2) <br /> <br />Location: Station 13+240n the canal. <br />Type: Riveted plate steel pipe <br />Length .......... ............ ......... ,. <br />Capacit), .... ................ ........... <br />Cross section: Circular <br />Diameter ............................... <br /> <br />STEEL SIPHON fORCHARD MESA CANAL No. 21 <br /> <br />Location: Station 21 + 29 on the canal. <br />Type: Riveted plate steel pipe <br /> <br />503 It <br />HO ft3/s <br /> <br />4.5 It <br /> <br />737.8 It <br />14.3 ftJ/s <br /> <br />1.75 ft <br /> <br />16.1 mi <br />65 ft3/s <br />7 It <br />1.5:1 <br />2.8 It <br /> <br />426_5 It <br />6U 1t3/s <br /> <br />4 It <br />