My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09291
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:35 PM
Creation date
10/12/2006 3:34:25 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.P
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
5/3/1979
Author
USACOE
Title
Transcript of a Public Hearing for Re-evaluation of A Flood Control Operation Plan for Hoover Dam: Yuma AZ
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br />C'J' <br />co <br />0: <br />C\1 <br /> <br />,.. <br />- <br /> <br />., <br /> <br />- <br /> <br />. <br /> <br />. <br /> <br />73 <br /> <br />release from Colorado River Storage. Additional savings in <br /> <br />hydropower potential are available by use of water from. <br /> <br />Alamo Lake to meet irrigation and municipal needs in the <br /> <br />Lower Colorado River system. <br /> <br />Energy sources are getting more costly. Demands <br /> <br />will drastically increase if the desalting plant is built. <br /> <br />. <br /> <br />Our observations are that increases are contemplated due to <br /> <br />need for power and the availability of excess water for <br /> <br />municipal and agricultural use may continue for four (4) or <br /> <br />, , five (5) years. with these in mind, it seems practical to <br /> <br /> : " <br /> - <br />"n <br />'--' <br /> ! , <br /> :' <br /> Ll !: <br /> ,; <br /> I " <br /> i , <br /> ! <br /> i " <br /> , <br /> <br />delay construction of the desalter. Further technological <br /> <br />developments may preclude the need for the large expenditure <br /> <br />for tile desalting plant with its accompanying excessive <br /> <br />energy demands. <br /> <br />Conservative use of water for future availability for hydr. <br /> <br />hydropower to meet growing needs is absolutely necessary <br /> <br />within safety limits for flood control. <br /> <br />It's signed M. L. Smith, Chairman, Laguna NRCD. <br /> <br />- <br /> <br />PRESIDING OFFICER: Thank you very much, sir. <br /> <br />Are there any other comments or questions? Okay, with that <br /> <br />I'm going back to my script. One thing I do want to say is <br /> <br />that this has certainly been one of the more productive <br /> <br />0; public meetings we I ve had thus far out of the Corps and <br /> <br />: I certainly a well-attended one, which would indicate to me <br /> <br />'-' <br /> <br />'I <br /> <br />that there is a real sincere interest in what's going on <br /> <br />Al I IJ: n nl- PI II I~ MI.... <br />
The URL can be used to link to this page
Your browser does not support the video tag.