Laserfiche WebLink
<br />000673 <br /> <br />3.5 Make it Go Some..here Else ................................37 <br /> <br />3.5.1 <br /> <br />Construct Landslide Deflection Structures.......... .37 <br /> <br />3.6 Stop it from Movin~ ......................................39 <br /> <br />:3.6.1 <br />"3.6.2 <br />3.6.3 <br />3.6.4 <br />3.6.5 <br />3.6.6 <br />3.6.7 <br />3.6.8 <br /> <br />Cease or Reduce Irrigation of the Slide ............40 <br />Control Drainage on the Slide by Regrading .........42 <br />Construct O,ains in the Slide..................... .42 <br />Pump Wate, Out of the Slide....................... .44 <br />Channelize the River at the Base of the Slide ......44 <br />Install Toe Anchors to Stabilize the Slide....... ..45 <br />Stabilize the Slide by Special Treatment ..... ......47 <br />Remove Unstable Slide Material............. ...... ..47 <br /> <br />3.7 Oon't Let it Flood .......................................49 <br /> <br />3.7.1 <br />3.7.2 <br />3.7.3 <br />3.7.4 <br />3.7.5 <br />3.7.6 <br />3.7.7 <br />3.7.8 <br /> <br />Modify the '.,eather ................................ .49 <br />Divert Water from the Basin. ..... ..... . ........... .51 <br />Release Water from Upstrea~ Reservoirs .............52 <br />Store Water in UpstC'earn. Reset'voiC"s ................ .52 <br />Build a Ne'. Flood Control Dam....... .. . .......... ..53 <br />Construct a Pre-slide Outlet ',Jorks ................ .54 <br />Divert the Rivet" AC'ound the Slide...................58 <br />Excavate a Tunnel ..................................60 <br /> <br />3.8 Wait Until the Last Minute ...............................63 <br /> <br />3.8.1 <br />3.8.2 <br />3.8.3 <br />3.8.4 <br />3.8.5 <br />3.8.6 <br />3.8.7 <br /> <br />Maintain Conveyance Capacity of the Channel ........63 <br />Provide a Seepage Path in the Slide............... .63 <br />Syphon Water Over the Slide ........................64 <br />Pump Wa te r Over the Slide ..........................64 <br />Excavate an Overflow Spi Ilway in the Dam ... ........66 <br />Blast an Overflow Spillway in the Hillside........ .66 <br />Cause a Controlled Failure of the SlIde Dam ........66 <br /> <br />References .." ....."..... ............_. ....................... ....... ..67 <br /> <br />Technical Appendix I <br /> <br />Technical Appendix II <br /> <br />Design of the Monitoring System <br /> <br />Reconn~issance. Instrumentation and Monitoring of <br />the Dowds Junction Slide Complex <br /> <br />Technical Appendix III <br /> <br />Emergency Prcpa~~dness <br /> <br />ii <br />