Laserfiche WebLink
<br />000682 <br /> <br />RECOilMENOA Tl ON <br /> <br />TlMEFRAME <br /> <br />OPTION 3: DON'T LET IT FLOOD( cant'd) <br />RESPONSIBLE PARTY <br /> <br />ESTIMATED COST <br /> <br />Construct pre- <br />slIde outlet ~Q{'s': <br /> <br />Option A. Pipeline Would require several <br />for ~ater only pIpes for tne requIred <br />capacity ~hich ~ould <br />be expenslve and not <br />multifunctional <br /> <br />option B. Three- <br />box culvert for <br />the road, rlver <br />and railroed <br /> <br />Would be constructed <br />at t~o locations: <br />Meado~ Mountein and <br />Whiskey Creek. This <br />~ould be a future <br />action but ~ould re- <br />quire construction <br />before the slide moves. <br /> <br />Best option; ho~ever, high <br />front-end cost to all <br />parties. <br /> <br />Divert river <br />around slide <br /> <br />Would require Innovative idea <br />construction of a <br />canal and trestle for <br />Whiskey Creek end/or <br />Meado~ Mountein slides. <br /> <br />'Recommendation: Feasibility Study by Engineering firm to evaluate these options as '.ell .", <br />the cost to remove the slide. CDH would coordinate the preparation of the scope of ~ork. <br />The cost ~ould be about $50,000 from an as yet unkno~n source. <br /> <br />-x i ; - <br />