My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09277
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:27 PM
Creation date
10/12/2006 3:33:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.700
Description
Colorado Big Thompson Project - Annual Operating Plans
Basin
South Platte
Water Division
1
Date
1/1/1998
Title
Annual Operating Plans - Colorado Big Thompson Project and Western Division System Power Operations - Water Year 1998 Summary of Actual Operations
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />********** <br /> <br />o <br />o <br />t-I> <br />CoO <br />..., <br />~l <br /> <br />This is the 47th annual report for the Pick-Sloan Missouri Basin Program Western Division <br />. System (System) power operations. For the purpose of this report, the System also includes the <br />Yellowtail Power Plant units I & 2 and the generating facilities of the Fryingpan-Arkansas <br />Project. The purpose of the report is to inform interested parties of the generation and pump . <br />energy requirements of the hydropower system. The report consists of two parts: One part <br />describes the actual generation and pumping operations for water year 1998. <br /> <br />An update on the System generation and pumping operations is included in the "Water Supply <br />and Utilization" report, which is issued monthly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.