Laserfiche WebLink
<br />a <br />o <br />l- <br />ee <br />t.,) <br />QO <br /> <br />COLORADO-BIG THOMPSON PROJECT <br />ANNUAL OPERATING PLANS <br /> <br />TABLE OF CONTENTS <br /> <br />SUBJECT <br /> <br />Page <br /> <br />LIST OF TABLES <br /> <br />1 <br /> <br />LIST OF EXHffiITS <br /> <br />ii <br /> <br />SUMMARY OF 1999 OPERATIONS <br /> <br />1 <br /> <br />DESCRIPTION OF THE <br />COLORADO-BIG THOMPSON PROJECT <br /> <br />3 <br /> <br />PROJECT PLANNING AND CONTROL <br /> <br />6 <br /> <br />WATER YEAR 1999 OPERATIONS <br /> <br />7 <br /> <br />Green Mountain Reservoir <br />Willow Creek Reservoir <br />Granby Reservoir <br />Lake Estes <br />Carter Lake <br />Horsetooth Reservoir <br />Flood Benefits <br /> <br />7 <br />.9 <br />10 <br />12 <br />14 <br />15 <br />16 <br /> <br />IRRIGATION REQUIREMENTS <br /> <br />16 <br /> <br />MINIMUM REQUIRED RESERVOIR RELEASES <br /> <br />17 <br /> <br />OPERATING CRITERIA FOR GREEN MOUNTAIN RESERVOIR <br /> <br />19 <br /> <br />GREEN MOUNTAIN HISTORIC USERS POOL AND THE ORCHARD MESA <br />CHECK CASE SETTLEMENT <br /> <br />22 <br /> <br />Background and Authority <br />Overview of the Stipulated Settlement <br />Management of the HUP Under the Operating Criteria <br /> <br />22 <br />22 <br />23 <br /> <br />OPERATION SKIM <br /> <br />24 <br /> <br />APPENDIX A - TABLES <br /> <br />Tables 1 to 4 <br /> <br />APPENDIX B - EXHffiITS <br /> <br />Exhibits 1 to 3 <br />