My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09245
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09245
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:15 PM
Creation date
10/12/2006 3:32:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100.40
Description
Colorado River Basin Salinity Control - Federal Agency Reports - BOR
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1988
Title
Salinity Update - October 1988
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SalinityUp:date <br /> <br />--- - - -. <br /> <br />October 1988 <br /> <br />-. . - - -- <br /> <br />-- - -. <br /> <br />l\) <br />Ul <br />0) <br />i-'- <br /> <br />Paradox Valley <br />work resumes in <br />Colorado <br /> <br />Construction resumes on the in- <br />~tanation of the injection tube for <br />the Paradox Vaney Unit deep in- <br />jection test wen, The injection test <br />wen was completed to a total <br />depth of about 16,000 feet. It was <br />closed and capped and the drill <br />rig dismantled, <br /> <br />The Environmental Protection <br />Agency (EP A) continues to <br />monitor the EPA-issued Under- <br />ground Injection Control (VIC) <br />permit and has determined that <br />the as-built well is adequate to <br />meet the design criteria. <br /> <br />- <br /> <br />The 5-1/2 inch special high <br />nickel alloy injection string was <br />ordered and produced in <br />Hereford, England, and in <br />Huntington, West Virginia. The <br />tubing string was threaded in <br />Alabama and is currently awaiting <br />delivery as needed. The inl'ection <br />wen No.1 should be comp ete by <br />late 1988. <br /> <br />Construction of the 4-mile brine <br />pipeline was completed in <br />September 1988, The brine <br />pipeline will transport the brine <br />from the prod uction well field to <br />the disposal well. The surface <br />treatment building is complete <br />and the wellhead injection build- <br />ing construction is underway, <br />This injection building will house <br />three 1600 horsepower high <br />pressure pumps. <br /> <br />Following completion of the <br />injection wen the surface facilities <br />will need to be completed, hooked <br /> <br />8273.100.40 <br /> <br />ll;$ ;l;)e~trij~ntoft~e'II.r~htil' <br />'lll'eanof.R~lamatio!t ......... ., <br />.~. 2uarterly'Re~ort ol{tbe <br />. C~~l'ado .River Water 'Quality. <br />. tm~rl}veuientPr()gram...' <br /> <br />""'1 <br />,.:-<:"(; <br />-e. <br />',' f-, ~ <br />/<1.';'/ <br /> <br />:~::f" <br />""",', <br />- <br />\~~; 1 <br /> <br /> <br />View of the brine injection facility. In the foreground is the spill prevention pond. <br />The relief line which penetrates the flexible membrane pond liner is visible. The brine <br />injection pumps will be used to pump the Paradox Valley brine into Injection Test Well <br />No.1 at an anticipated rate of 650 gallons pei minute. Normal operation will utilize two <br />pumps with the third as a backup. <br /> <br />up to the well and tested. Deep <br />wen injection is expected to start <br />around mid-summer of 1989. <br /> <br />A contract was initiated with <br />the Department of Energy and the <br />U,S, Geological Survey to analyze <br />the injection brine and resident for- <br />mation brine in the well to deter- <br />mine if the brines are compatible <br />for injection. Initial determination <br />appears to be satisfactory, <br /> <br />EP A is currently reviewing <br />proposed changes in the monitor- <br />ing systems. In addition, EP A <br />will review injection wne comple- <br />tion data, and monitor initial com- <br />patibility studies and test results <br /> <br />to assure that the well functions as <br />planned, <br /> <br />Lower Gunnison <br />Basin <br /> <br />Preconstruction funds for FY <br />1989 have been approved for the <br />winter water portion of the Lower <br />Gunnison Basin Unit. Monies in <br />the amount of $250,000 would be <br />.obligated to the Uncompahgre <br />Valley Water Users Association to <br />collect design data on their system <br />in preparation for construction, <br />
The URL can be used to link to this page
Your browser does not support the video tag.