Laserfiche WebLink
<br />I' . . <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />O~"~~3 <br />U ~I V j <br /> <br />TABLE 4. SUMMARY OF WIRSOS INPUT FOR POWDER WASH PROJECT <br /> <br />Little Snake Reservoir Data <br /> <br />Storage right, priority date of 9-27-77 = <br />Minimum active storage volume = <br />Maximum active storage volume = <br />Maximum primary outlet capacity = <br />Initial storage volume at beginning <br />of study period (70% Total) = <br /> <br />164,690 AF (1 annual fill only) <br />OAF <br />164,690 AF <br />1,000 cfs <br /> <br />115,000 AF <br /> <br />Area - Capacity relationship (developed by WWC from available mapping, see <br />Appendix C) <br /> <br />Powder Wash Power Plant Discharge Data <br /> <br />Water right, priority date of 9-27-77 <br />Average approximate demand <br /> <br />= <br /> <br />800 cfs <br />225 cfs <br /> <br />= <br /> <br />(Demand amount to be refined during firm yield study) <br /> <br />28 <br />