Laserfiche WebLink
<br />38 <br />Time (hours) <br /> <br />Fipre '''.22 Modelled changes in (a) tota' sand deposir volume and (bJ the sand deposit <br />volume above the 108 rrr'ls slage as funcrions of lime at location J in the Upper Unkar reach. <br /> <br />00G40 <br /> <br />. 100000 <br /> 80000 <br />~ <br />So <br />~ 60 000 <br />::I <br />~ <br />1 40 000 <br />! <br />~ <br /> <br />20 000 <br /> <br /> 25000 <br />. <br /> 20000 <br />1 <br />~ 15000 <br />::I <br />~ <br />I tOOOO <br />I <br /> 5000 <br /> 0 <br /> 0 <br /> <br />. <br /> <br />:;i <br />- <br /> <br />Modelling of sand deposition in Colorado River 381 <br /> <br /> <br />Discharge (m'ls), sand supply <br /> <br />.....1270,1ow <br />- - 1270, intllrmediat. <br />-1270,high <br />.....2830,1ow <br />- - 2830, intermediate <br />- 2830, high <br />- ZeIO IIn. <br /> <br />o <br /> <br /> <br />... ...... <br /> <br /> <br />o <br /> <br />t2 <br /> <br />24 <br /> <br />38 <br />Time (hounl) <br /> <br />48 <br /> <br />60 <br /> <br />n <br /> <br /> <br />Dlschsrge (""s), sand supply <br />. .... 1270, low <br />- - 1270, Intllrmedlate <br />- 1270,high <br />.....2830,low <br />- - 2830, Intermediate <br />- 2830, high <br /> <br />1r~....................................... <br />I. ______~-.------____ <br />. <br />. <br />. <br /> <br />------------------ <br /> <br />12 <br /> <br />24 <br /> <br />48 <br /> <br />60 <br /> <br />n <br />